Y -- Construction Manager as Constructor (CMc), New - Greenville, SC Federal Courthouse Building - (Draft)

Notice Date
5/27/2017
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
General Services Administration, Public Buildings Service (PBS), R4 Acquisition Management Division (47PE00), 77 Forsyth Street, Atlanta, Georgia, 30303, United States
 
ZIP Code
30303
 
Solicitation Number
GS--04-P-16-BV-C-7005
 
Point of Contact
Swindale Rhodes, Phone: 4044338317, Julius Teal, Phone: 404-331-1594
 
E-Mail Address
swindale.rhodes@gsa.gov, julius.teal@gsa.gov
(swindale.rhodes@gsa.gov, julius.teal@gsa.gov)
 
Small Business Set-Aside
N/A
 
Description
Greenville_CMa_Attachment_I_List_of_Stds_and_Critieria_documents.pdf SF_1442_GS-04-P-16-BV-C-7005__Greenville_SC_CMc_Solicitation.pdf Final_Concept_Submission_Reports_Calcs_(3).zip CMcSOW_Greenville_SC_CTHS_Attachment_B.pdf Past_Performance_Questionaire__Greenville,_SC_CMc_Attachment_E.pdf CMc301_Reps_and_Certs_Attachment_C.docx CMc_Pricing_Sheet_Attachment_A_REV_01.pdf Davis_Bacon_Wage_Rate__Attachment_D.pdf Layout of Water Main GSA From 527 Contractor's Qualification and Financial Information The_Agreement_Greenville_SC_CMc The_Solicitation USMS Pub 64 Vol III.pdf USAO Design Guide 10-13-15.pdf US Courts Design Guide 2007.pdf Updated Meeting Schedule Matrix_Design Restart_R02_0... Technology Policy for PBS-Owned Buildings Monitoring... SpringSt1_Irvine_2017_Water Main Relocation_Greenville SITESv2_Scorecard.pdf SITESv2_ReferenceGuide.pdf SITESv2_RatingSystem (1).pdf Project Milestone Schedule Update May 25 2017.pdf PBS_P_3490.2_Document_Security_for_Sensitive_But_Unclassified Information... PBS_1000.6_P-120__Public_Buildings_Service_Cost_and_.Schedule and Management Policy.. NBSAP_Final_Feb 2013.pdf NBSAP_Clarification3_2015 July-INS and GNS.pdf NBSAP_Clarification2_2014 Jun -4762.pdf NBSAP_Clarification1_2013 July Final-VOIDs.pdf MG Letter to Commissioner Dong re Design Guide Updat... GSARegion4BuildingAutomationSystemRequirementsv6.pdf... GSA GREENVILLE UTILITY Coffee site 2 5.5.2010.pdf GSA GREENVILLE TOPO Coffee site 2 5.5.2010.pdf GSA GREENVILLE BNDY-E Coffee site 2 5.5.2010.pdf GSA Bldg Commissioning Guide4-05.pdf GSA 019113CommissioningFY15UpdateOct.12014.docx.pdf GSA 018200DemonstrationTrainingFY15UpdateOct.12014. GSA 018111SustainableDesignRequirementsFY15UpdateOct GSA 017822 Operation _ Maintenance Documentation FY1... GSA 017810ProjectRecordDocumentsFY15UpdateOct.12014.... GSA 017700CloseoutProceduresFY15UpdateOct.12014.docx... GSA 017419ConstructionNonhazardousWasteManagementDispoal. GSA 017410 Construction Indoor Air Quality FY15 Updates. GSA 017350 Fire Prevention Precautions for Hot Work GSA 017000ExecutionRequirementsFY15UpdateOct.12014.d... GSA 016000 Product Requirements FY15 Update Oct. 1,... GSA 015950SafetyHealthFY15UpdateOct.12014.doc.pdf GSA 015930SecurityRegulationsFY15UpdateOct.12014.doc... GSA 015000 Temporary Facilities FY15 Update Oct. 1,... GSA 014200ReferencesFY15UpdateOct.12014_Solicitation... GSA 014100 Structural Testing Laboratory Services FY 15 Update GSA 014025QualityControlTestingforAirBarriersFY15Update GSA 015639TreePlantProtectionFY15UpdateOct.12014.doc... GSA 014000 Quality Assurance _ Control FY15 Update. GSA 013600COBieFY15UpdateOct.12014_SolicitationNo.GS-04-P-16-BV-C-7-005. GSA 013300 Submittal Procedures FY15 Update Oct. 1,... GSA 013220PhotographicDocumentationFY15UpdateOct.120... GSA 013200 Construction Progress Documentation FY15... GSA 013110Critical Path Method Scheduling for overProspectus GSA 013100 Project Management _ Coordination FY15 Up... GSA 013000 Electronic Project Management FY15 Update... GSA 012900 Payment Procedures FY15 Update Oct. 1, 20... GSA 012500 Subst. Proceed FY15 Update Oct. 1, 2014. GSA 012400 Options FY15 Update Oct. 1, 2014 (NA).pdf... GSA 012100 Allowances FY15 Update Oct. 1, 2014_Solicitation. GSA 011400 Work Restrictions FY15 Update Oct. 1, 201... GSA 011000 SUMMARY FY15 Update Oct 1, 2014_Solicitation. Greenville, SC Courthouse Project Phase II ESA report Greenville SC AE SOW CONTRACT MODIFICATION_6-17-16_Final. Greenville Boring locations contamination phase II.. Courts Mailroom Construction Guidelines.pdf CONTRACTOR_GREEN_PRODUCTS_REPORT.pdf Construction_Waste Management and Disposal Specifications CMa SOW 9.01.2016_FINAL 092216.pdf A-E SOW CMc_BIM - Final.pdf A-E Scope of Work Amendment August 22 2016.pdf 2017-04-18-finishes.pdf 2014 Final, Pub 64 Revised.pdf 06032016 Fit For Purpose in the Changing Climate Greenville... SOLICITATION NOTICE - SOLICITATION NO: GS-04-P-16-BV-C-7005 New - Greenville, SC Federal Courthouse Building Region: 4 City: Greenville State: South Carolina Contracting Officer: Swindale Rhodes Phone Number: (404) 433-8317 PROJECT: Carroll A. Campbell Jr. United States Federal Courthouse, Greenville, SC BUILDING TYPE: United States Courthouse CLIENT AGENCY: United States District Courts, United States Marshals Service, United States Probation Office, United States Federal Public Defender, Office of the United States Attorney (Trial Prep) and GSA's Public Buildings Service SIZE: Approximately 193,000 gross square feet, including parking PARKING SPACES: 70 inside parking spaces BUDGET: $70,000,000 - $80,000,000 Continuing a legacy of outstanding public architecture that was initiated with the In this context, GSA announces an opportunity for Construction Excellence in public architecture for performance of Construction Manager as Constructor (CMc) services in accordance with GSA quality standards and requirements. As required by law, regulation and/or Executive Order, all facilities will meet federal energy goals, security requirements, and achieve at, a minimum, LEED Gold V4 and SITES Silver certification. Issuance of this GSA Request for Proposal (RFP) is for a Construction Manager as Constructor, (CMc) contract for the new "Carroll A. Campbell Jr. United States Federal Courthouse" in Greenville, SC. This acquisition encompasses the construction of approximately 193,000 gross square feet of offices and related space that will provide seven courtrooms and nine chambers to accommodate nine judges and 70 inside, secured parking spaces. Other court related tenants include the U.S. Probation, Federal Public Defender, and the U.S. Department of Justice (U.S. Marshals Service and Office of the U.S. Attorney (Trial Prep)). The project site is located in downtown Greenville, SC at the southeast corner of the intersection of East North Street and North Spring Street. Site size is approximately 1.97 acres. Due to the size and complexity of the work, the best procurement method is full and open competition. The CMc is at risk and is responsible for involvement in the project development and administration of the construction. The CMc's approach to Design Phase Services will include, but not be limited to, schedule development, costestimating and cost-reconciliation services, identifying and addressing key subcontractors' participation, constructability reviews, and value engineering/life cycle cost analysis services. The CMc's approach to Construction Phase Services will include, but not be limited to, cost loaded and resource loaded scheduling, cost control including contingency management, change order management, "open book accounting," site demolition, utility relocation and physical construction of the building, to include commissioning of building systems, turnover, occupancy through project closeout. GSA intends to award a single, fixed price contract for Design Phase Services, with an option to award Construction Phase Services as a Guaranteed Maximum Price, with a sharing ratio, pursuant to FAR Subpart 16.204 -- Fixed-Price Incentive Contract type. For this contract award process, GSA will issue a one phase solicitation, based upon FAR Subpart, 15.101 -- Best Value Continuum. The Contract contemplated for this solicitation will provide for a Guaranteed Maximum Price (GMP) with CMc Contingency Allowance (CCA), and determines the contractor's compensation in a manner significantly different from a firm-fixed-price contract. For this RFP, non-price factors, when combined, will be significantly more important than the total evaluated price. Evaluations will be based on technical factors as well as price. The Government reserves the right to evaluate proposals and make an award without conducting discussions (clarifications may be made as described in FAR 15.306(a)). The Government may negotiate the CMc's fee for Design Phase Services and/or estimated cost of the work for Construction Phase Services including profit, general conditions and overhead costs as well as any other aspect of the offer as deemed necessary. In accordance FAR Subpart 15.305, the Contracting Officer will determine which proposals are within the competitive range based on the evaluated price and the non price evaluation factors included in the RFP. The Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s). Total Evaluated Price shall be calculated using the prices indicated on the Price Schedule. Bond Requirements A bid guarantee will be required 90 days prior to the exercise of the Construction Option. The option award will require performance and payment bonds as specified in the Agreement. General Accepted Accounting Principles (GAAP) Certification Requirement: The GAAP Certification must be provided from the accountant directly to the Contracting Officer by the submission date for initial proposals. The Offeror must submit all disclosures in accordance with FAR 52.230-1, Cost Accounting Standards Notice and Certifications and FAR 52.230-7, Proposal Disclosure - Cost Accounting Practice Changes. Subcontracting Criteria: This procurement will be open to both large and small business firms. The firm (if not a small business concerns) shall be required to present an acceptable small business subcontracting plan in accordance with FAR 19.7, as part of its proposal. Pre-proposal Conference and Networking Session: Preproposal conference was hosted May 25th in conjunction with a Small Business Networking Session for interested Offerors based upon the Presolicitation notice issued via FBO for Solicitation No. GS-04-P-BV-C-7005, May 01, 2017. Contracting Office Address: 77 Forsyth Street Atlanta, Georgia 30303 United States
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/GSA/PBS/4PCA/GS--04-P-16-BV-C-7005/listing.html)
 
Place of Performance
Address: The site is bounded by East North, North Irvine, East Coffee and North Spring Streets, Greenville, South Carolina, 29601, United States
Zip Code: 29601
 
Record
SN04524925-W 20170529/170527233055-4dd1627d5ee46bc917921a5704ca650f (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.