Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JUNE 02, 2017 FBO #5670
SOLICITATION NOTICE

Z -- Intent for Single Source Announcement for Power Supply upgrade and Warranty for Integrated Control and Monitoring System

Notice Date
5/31/2017
 
Notice Type
Presolicitation
 
NAICS
334511 — Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufacturing
 
Contracting Office
FEDERAL AVIATION ADMINISTRATION, AAQ812 AC - Mike Monroney Aeronautical Center (Oklahoma City, OK)
 
ZIP Code
00000
 
Solicitation Number
27430
 
Response Due
6/2/2017
 
Archive Date
6/2/2017
 
Point of Contact
Shelley Harrell, shelley.harrell@faa.gov, Phone: 405-954-7883
 
E-Mail Address
Click here to email Shelley Harrell
(shelley.harrell@faa.gov)
 
Small Business Set-Aside
N/A
 
Description
NOTICE OF DECISION TO CONTRACT WITH A SINGLE-SOURCE: The Federal Aviation Administration (FAA), Mike Monroney Aeronautical Center, intends to award a single-source Contract to New Bedford Panoramex. Warranty Maintenance Services will include technical, hardware and software support on the following 17 commissioned ICMS sites in the NAS to include: Telephone Technical Support, Field Technical Support, Return Material Authorization, and Software support. 1. Atlanta (ATL) 2. Denver (DEN) 3. Chicago (ORD) 4. Newark (EWR) 5. Dulles (IAD) 6. Houston (IAH) 7. Indianapolis (IND) 8. Minneapolis-St. Paul (MSP) 9. Phoenix (PHX) 10. Seattle (SEA) 11. Salt Lake City (SLC) 12. St. Louis (STL) 13. LaGuardia (LGA) 14. John F. Kennedy (JFK) 15. Cleveland (CLE) 16. Charlotte, NC (CLT) 17. Oklahoma City (AJW) The contractor shall remove and replace the power supplies at 13 ICMS-equipped sites. Specifically, at these 13 sites, the contractor shall remove and replace the power supplies in the rack-mounted ICMS equipment with harmonic-free units so that ICMS ® can meet the parameters necessary to allow the ICMS to be connected to the Critical Power Bus of the site. This does not include the server workstation. The parameters to be met are Power Factor, Inrush Current, and Total Harmonic Distortion as described in Order 6030.20F ELECTRICAL POWER POLICY, and Specification FAA-G-2100H ELECTRONIC EQUIPMENT, GENERAL REQUIREMENTS. The FAA will schedule and coordinate the installations with the FAA Operational ICMS sites and the vendor. The contractor shall provide appropriate personnel to travel to the sites at the request of the FAA. - The 13 ICMS-equipped sites which are to have the power supplies updated are: Atlanta Denver Chicago O ™Hare (ORD)* Elgin (C90)* Newark Dulles Houston Indianapolis Minneapolis-St. Paul Phoenix Seattle Salt Lake City Oklahoma City “ Test bed *ORD and C90 are part of the same operational system but are treated as separate systems for this purpose. If you're viewing this announcement from a source other than Federal Aviation Administration Contract Opportunities (FAACO), visit https://faaco.faa.gov/index.cfm/announcement/view/27430 to view the original announcement.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FAA/MMACTR/27430/listing.html)
 
Record
SN04527178-W 20170602/170531235326-390b7f2640859760d082632f521a965c (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.