Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JUNE 09, 2017 FBO #5677
MODIFICATION

Z -- Herbicide Services for Texoma Lake - Amendment 2

Notice Date
6/7/2017
 
Notice Type
Modification/Amendment
 
NAICS
561730 — Landscaping Services
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Tulsa, Attn: CESWT- CT, 1645 South 101st East Avenue, Tulsa, Oklahoma, 74128-4609, United States
 
ZIP Code
74128-4609
 
Solicitation Number
W912BV-17-Q-0031
 
Point of Contact
Douglas D. Buffington, Phone: 9186697078
 
E-Mail Address
douglas.d.buffington@usace.army.mil
(douglas.d.buffington@usace.army.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
SECTION J Amendment 01 Combined Pre-Solicitation and Solicitation Notice Herbicide Services Texoma Lake, Texas and Oklahoma W912BV-17-Q-0031 U.S. Army Corps of Engineers, Southwestern Division (SWD), Tulsa District (SWT) intends to issue a commercial solicitation, W912BV-17-Q-0031 for a Firm-Fixed-Price contract for Herbicide Services at Texoma Lake in Texas and Oklahoma. The solicitation will be issued as a 100% Small Business set aside. The North American Industrial Classification System (NAICS) Code is 561730 and the applicable Small Business Size Standard, as established by the U.S. Small Business Administration, is $7,500,000.00. The resulting contract will be issued on a Firm Fixed Price basis for a base period and four (4) option periods to be exercised at the Governments discretion, to the responsible offeror whose offer is conforming to the requirements of the solicitation and will be most advantageous to the Government considering price. The anticipated award date is on or about 12 June 2017. The solicitation will be issued via Internet only on Feb Biz Opps Website at http://www.fbo.gov. It is the contractors' responsibility to check the above-listed internet address daily for any posted changes to the solicitation. Any amendments issued to the solicitation must be acknowledged by potential offerors. Solicitation issue date is expected to be on or about 12 May 2017. Quotes are anticipated to be due on or about 16 June 2017. Contractors must be registered and current with System for Award Management (SAM) in order to receive a Government contract award. To register, the SAM Internet address is: http://www.sam.gov. Location: Texoma Lake, Texas and Oklahoma Previous Contract Number: W912BV-16-P-0089 Previous Contractor: US Applicators, LLC The total value of the previous contract (base and four option years) was: $65,623.20 (New requirements are added, change in scope) Any questions and inquiries related to this solicitation shall be submitted through Bidder's Inquiry only. The Solicitation Number is: W912BV-17-Q-0031 The Bidder Inquiry Key is: BQDDRH‐NPDI97 The following Sustainability Clauses are included in the Solicitation: 52.223-1 Biobased Product Certification 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts 52.223-4 Recovered Material Certification 52.223-5 Pollution Prevention and Right-to-Know Information 52.223-10 Waste Reduction Program 52.223-11 Ozone-Depleting Substances 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts 52.223-20 Aerosols TULSA DISTRICT CORPS OF ENGINEERS DOUGLAS BUFFINGTON, CECT-SWT-E 1645 S. 101ST EAST AVE TULSA, OK 74128-4609 918-669-7078 FAX: (918) 669-7495 Memorandum for Record W912BV-17-Q-0031 Lake Texoma Herbicide The Contract Writing System utilized by this office is down for scheduled maintenance. The Solicitation W912BV-17-Q-0031 requires corrections. The following Memorandum is to provide information as to the items which will be updated: 1. The Offer Due Date SF 1449 Block 8 will be extended from 2:00 PM CST on 2 June 2017 to 2:00 PM CST on 9 June 2017. 2. SECTION A Instructions to Offerors Bidder's Inquiry will be extended to 2:00 PM CST on 2 June 2017. 3. SECTION A Instructions to Offerors Site Visit will be corrected to 10:00 AM Local Time on 30 May 2017. 4. SECTION B Pricing Schedule will be corrected to reflect Total Vegetation instead of Woody Growth. 5. SECTION C Statement of Work, Appendix A, 2.1. will be updated to read: Herbicide Applications - Total Vegetation Control. Apply herbicide for a total control of vegetation and woody vegetation on the Riprap areas of the Outlet Channel located at the embankment (North and South Banks), the riprap areas at the Cumberland North & South Dikes, on sand filters at Cumberland North and South dikes, the upstream rip rap area of the embankment, and the rip rap areas associated with the spillway boat ramp and intake structure. Apply herbicide to achieve a 95% kill rate. Tables and maps can be located in the Attachments. 6. SECTION C Statement of Work, Appendix A, 2.2. will be updated to read: Herbicide Applications - Broadleaf / Johnson Grass Vegetation Control. Apply herbicides to control broadleaf vegetation (Specifically Johnson Grass) on downstream slopes of Dam Embankment and Cumberland North and South Dikes. Herbicide shall be applied as to do no damage to Bermuda grass and achieve a 90% kill rate to broadleaf vegetation. Tables and maps can be located in Attachments. 7. SECTION C Statement of Work, Appendix A, 2.3. will be deleted. 8. SECTION J Attachments and Maps, Table A-2 will be updated to reflect Rip Rap Areas and Outlet Channel. 9. SECTION J Attachments and Maps, the following Boundary Maps will be updated: Dam Embankment - North and South, North Cumberland Dike - East and West, South Cumberland Dike, North Cumberland Dike - East and West, and Outlet Channel. It is the Contractors' responsibility to check FedBizOps for the posting of the pending change to the Solicitation. Added: <input type="hidden" name="dnf_class_values[procurement_notice][description][1][added_on]" value="2017-05-31 14:23:37">May 31, 2017 2:23 pm Modified: <input type="hidden" name="dnf_class_values[procurement_notice][description][1][modified_on]" value="2017-06-07 16:19:49">Jun 07, 2017 4:19 pm Track Changes Herbicide Services for Lake Texoma 1. Amendment 2 is issued to correct the ATTACHMENT w hich w as not attached to Amendment 1. 2. The Offer Due Date SF 1449 Block 8 is extended from 2:00 PM CST on 9 June 2017 to 2:00 PM CST on 16 June 2017. 3. SECTION A Instructions to Offerors Bidder's Inquiry is extended to 2:00 PM CST on 12 June 2017. 4. SECTION J Attachments and Maps, Table A-2 is updated to reflect Rip Rap Areas and Outlet Channel. 5. POC for this Modification is Douglas Buffington, Douglas.D.Buffington@USACE.Army.mil, phone 918-669-7078, fax 918-669-7495. 6. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED AND IN FULL FORCE AND EFFECT. SECTION SF 30 - BLOCK 14 CONTINUATION PAGE to Solicitation W912BV-17-Q-0031 HERBICIDE SERVICES LAKE TEXOMA 1. This Modifiication is to correct the SF 1449, SECTION A INSTRUCTIONS TO OFFERORS, SECTION B PRICING SCHEDULE, SECTION C STATEMENT OF WORK, and SECTION J ATTACHMENTS AND MAPS. 2. The Offer Due Date SF 1449 Block 8 is extended from 2:00 PM CST on 2 June 2017 to 2:00 PM CST on 9 June 2017. 3. SECTION A Instructions to Offerors Bidder's Inquiry is extended to 2:00 PM CST on 2 June 2017. 4. SECTION A Instructions to Offerors Site Visit is corrected to 10:00 AM Local Time on 30 May 2017. 5. SECTION B Pricing Schedule is corrected to reflect Total Vegetation instead of Woody Growth. 6. SECTION C Statement of Work, Appendix A, 2.1. is updated to read: Herbicide Applications - Total Vegetation Control. Apply herbicide for a total control of vegetation and woody vegetation on the Riprap areas of the Outlet Channel located at the embankment (North and South Banks), the riprap areas at the Cumberland North & South Dikes, on sand filters at Cumberland North and South dikes, the upstream rip rap area of the embankment, and the rip rap areas associated with the spillway boat ramp and intake structure. Apply herbicide to achieve a 95% kill rate. Tables and maps can be located in the Attachments. 7. SECTION C Statement of Work, Appendix A, 2.2. is updated to read: Herbicide Applications - Broadleaf / Johnson Grass Vegetation Control. Apply herbicides to control broadleaf vegetation (Specifically Johnson Grass) on downstream slopes of Dam Embankment and Cumberland North and South Dikes. Herbicide shall be applied as to do no damage to Bermuda grass and achieve a 90% kill rate to broadleaf vegetation. Tables and maps can be located in Attachments. 8. SECTION C Statement of Work, Appendix A, 2.3. is deleted. 9. SECTION J Attachments and Maps, Table A-2 is updated to reflect Rip Rap Areas and Outlet Channel. 10. SECTION J Attachments and Maps, the following Boundary Maps are updated: Dam Embankment - North and South, North Cumberland Dike - East and West, South Cumberland Dike, North Cumberland Dike - East and West, and Outlet Channel. 11. POC for this Modification is Douglas Buffington, Douglas.D.Buffington@USACE.Army.mil, phone 918-669- 7078, fax 918-669-7495. 12. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED AND IN FULL FORCE AND EFFECT.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA56/W912BV-17-Q-0031/listing.html)
 
Place of Performance
Address: Texoma Lake, Denison, Texas, United States
 
Record
SN04535621-W 20170609/170607234735-e595930c6d5e0e9af8f0aedff447365e (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.