AWARD
Z -- Black Bear Trail Bridge Repair Project
- Notice Date
- 6/26/2017
- Notice Type
- Award Notice
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Agriculture, Forest Service, R-1 Western Montana Acquisition Zone (Lolo NF; Flathead NF; Bitterroot NF; Regional Office; Aerial Fire Depot), Building 24, Fort Missoula Road, Missoula, Montana, 59804, United States
- ZIP Code
- 59804
- Solicitation Number
- AG-0343-S-17-0026
- Archive Date
- 7/11/2017
- Point of Contact
- Tami L Mitchell, Phone: 406.329.1009
- E-Mail Address
-
tlmitchell@fs.fed.us
(tlmitchell@fs.fed.us)
- Small Business Set-Aside
- N/A
- Award Number
- AG-0343-C-17-0037
- Award Date
- 6/26/2017
- Awardee
- Battle Ridge Builders LLC, 4505 Thorpe Road<br />, Belgrade , Montana 59714, United States
- Award Amount
- $160,100
- Line Number
- All Items
- Description
- The Western Montana Acquisition Zone anticipates awarding a contract for repairs to the Black Bear Suspension Cable Pack Trail Bridge in the Bob Marshall Wilderness on the Spotted Bear Ranger District of the Flathead National Forest. Work includes, but is not limited to, temporarily supporting the bridge superstructure while removing and replacing all of the timber tower members. The removed bridge materials will be stacked at a designated location near the south bridge approach for future removal by the Forest Service. The work includes repair of the existing concrete tower pedestals, timber approach improvements, adjusting bridge camber using hanger cables, and adding corrosion protection to all steel cables. The precise details of performing the work are not stipulated except as considered essential for the completion of the work. Furnish all labor, material (but for government furnished), equipment, tools, transportation, temporary works and supplies necessary to complete the work according to the contract. The Government estimates the value of the work to be between $100,000 and $250,000. The solicitation is expected to be available approximately April 4, 2017. All work on the bridge, including packing is restricted to July 15, 2017 to September 30, 2017 and July 15, 2018 to August 31, 2018. No work will be allowed outside of these dates. The bridge must be fully operational and open for use outside of these dates. Project is located in a designated wilderness area and therefore no wheeled or motorized equipment shall be allowed. All work on the project will be performed using wilderness methods. No prebid tour is scheduled. Interested parties may contact Chris Ste4en at 406.758.3549 at the Flathead National Forest.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/03R6/Awards/AG-0343-C-17-0037.html)
- Record
- SN04557142-W 20170628/170626234338-6dc8b3bb83cd79b8a7b18de47d5881f9 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |