Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JULY 13, 2017 FBO #5711
SOLICITATION NOTICE

Z -- Asphalt Overlay, Ava Ranger District - Solicitation

Notice Date
7/11/2017
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Agriculture, Forest Service, Northern Research Station, 1992 Folwell Avenue -, Acquisition Management, St. Paul, Minnesota, 55108
 
ZIP Code
55108
 
Solicitation Number
AG-64R4-S-17-0022-1
 
Archive Date
8/5/2017
 
Point of Contact
David Easter, Phone: 651-649-5236
 
E-Mail Address
dceaster@fs.fed.us
(dceaster@fs.fed.us)
 
Small Business Set-Aside
N/A
 
Description
Solicitation This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. The solicitation AG-64R4-S-17-0022 is issued as RFQ. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2005-95 Open Market, NAICS 237310 Furnish all labor, equipment and materials to complete the following work: Visitor Parking Lot Overlay: The parking lot (332 SY) will be marked for overlay by the Forest Service. The existing parking lot surface shall be free of loose material, dirt, or other deleterious material by approved methods. Any pot holes or significant depressions shall be filled with asphalt and compacted before overlay begins. Headers with existing asphalt pavement or concrete shall be milled before overlay to match elevation. Tack coat oil shall be applied as specified. Provide a minimum of 2" compacted depth overlay of approved hot asphalt mix. Provide three 411 wide white pavement markings 20 foot in length as located by the COR. 48 hour notice must be given before construction begins. Contractor shall provide all traffic control to perform project. Care shall be taken not to damage existing roadway. Warehouse Road Overlay: The road (304 SY) will be marked for overlay by the Forest Service. The existing road surface shall be free of loose material, dirt or other deleterious material by approved methods. Any pot holes or significant depressions shall be filled with asphalt and compacted before overlay begins. Headers with existing asphalt pavement or concrete shall be milled before overlay to match elevation. Tack coat oil shall be applied as specified. Provide 2" compacted depth overlay of approved hot asphalt mix. 48 hour notice must be given before construction begins. Contractor shall provide all traffic control to perform project. Care shall be taken not to damage existing roadway. Site Visit: A contractor evaluation of site is recommended. A pre-bid visit with Darren Morris; Transportation Engineer, can be scheduled. FAR 52.212-1; 52.212-2; 52.212-3; 52.212-4, 52.212-5 apply to this acquisition. Quotes are due 7/21/17. eMail submissions to dceaster@fs.fed.us
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/63PX/AG-64R4-S-17-0022-1/listing.html)
 
Place of Performance
Address: Ava Ranger District, 1103 S Jefferson, AVA, Missouri, 65608, United States
Zip Code: 65608
 
Record
SN04574222-W 20170713/170711234834-47a2f03f1522fae70ca18e1f8d22f509 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.