DOCUMENT
S -- Copy of Suited backfill needed for newly constructed crypt field. For proper coordination with the field, the following individuals are assigned to this procurement and need to be included on all correspondence related to it. - Attachment
- Notice Date
- 8/2/2017
- Notice Type
- Attachment
- NAICS
- 812220
— Cemeteries and Crematories
- Contracting Office
- Department of Veterans Affairs;NCA Contracting Service;75 Barrett Heights Rd. Suite 309;Stafford VA 22556
- ZIP Code
- 22556
- Solicitation Number
- VA78617Q0646
- Response Due
- 8/13/2017
- Archive Date
- 10/12/2017
- Point of Contact
- Joseph Mendoza
- E-Mail Address
-
7-6287<br
- Small Business Set-Aside
- Service-Disabled Veteran-Owned Small Business
- Description
- DEPARTMENT OF VETERANS AFFAIRS, RIVERSIDE NATIONAL CEMETERY NATIONAL CEMETERY ADMINISTRATION Section 54A - Crypt Field Backfill Project Oakland, California Riverside, California Page 1 of 2 A. STATEMENT OF WORK GENERAL REQUIREMENTS SUMMARY OF WORK: WORK AREA: All work is to be performed on Riverside National Cemetery. The work area includes Section 54A, Section 54C, and their borders. The borders are the landscape areas between the burial plots and the physical boundaries of the burial sections. Section 54A is a crypt field burial section with pre-placed concrete crypts and includes the perimeter landscape areas between the crypt field and its boundaries. Section 54C is an in-ground cremains burial section and includes the landscape areas between the section and its boundaries. Concrete walks bounds the work area on the south and east; and landscape beds bound the site on the north. A future crypt burial section 54B borders the work area on the west. Section 54B may be under excavation during execution of the current contract. There is no significant existing vegetation within the work area. Turfgrass will be planted throughout the work area by Others under separate contract. (See Attachment A Conceptual Grading Plan and Details, for the site location and limit-of-work.) BACKFILL CRYPT FIELD: The Contractor gaining award shall provide all personnel, management, supplies, transportation, equipment and supervision necessary to perform and complete all work to backfill the crypt field with imported topsoil for cemetery section 54A that includes, but not limited to: site surveying, grading and drainage plans, import topsoil testing, imported topsoil supply, backfill and compaction, compaction testing, site grading and drainage, soil amendment, and restoration work. PERIMETER SOIL REPLACEMENT: The Contractor gaining award shall provide all personnel, management, supplies, transportation, equipment and supervision necessary to perform and complete all work to replace the top 8 inches of existing surface soil within the borders of Section 54A crypt field, and Section 54C and its borders that includes, but not limited to: site surveying, grading and drainage plans, surface soil removal, subsoil modification, import topsoil testing, imported topsoil supply, backfill and compaction, compaction testing, site grading and drainage, soil amendment, and restoration work. POROUS FLEXIBLE PAVING SYSTEM (TURF PAVING) INSTALLATION: The Contractor gaining award shall provide all personnel, management, materials, supplies, transportation, equipment and supervision necessary to perform and complete all work to construct a porous flexible paving system in the easement between Section 54A and 54C, including, but not limited to: site surveying, grading and drainage, excavation and backfill, aggregate base, porous flexible paving units, and topsoil placement. Incidental work includes raising and/or lowering of utility boxes to match profile of turf paving; raising and/or lowering of irrigation heads; installing Government-provided concrete sprinkler protectors. The Contractor will complete all work within One-hundred and twenty (120) calendar days after receipt of Notice of Award, subject to all terms, conditions, provisions, and schedules of the contract. Performance shall be in accordance with the requirements, conditions, terms and representations contained in this solicitation. There are NO headstones erected within the limit-of-work; however there are headstones on the adjacent cemetery section 52A. The Contractor will protect all headstones and markers from damage during the project. The Contractor will ensure that headstones or marker are protected from damage or being discolored from dirt or soil contact. Headstones and markers will not be physically removed from the gravesite during the project.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/VANCA/VANCA/VA78617Q0646/listing.html)
- Document(s)
- Attachment
- File Name: VA786-17-Q-0646 VA786-17-Q-0646_1.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=3706143&FileName=VA786-17-Q-0646-000.docx)
- Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=3706143&FileName=VA786-17-Q-0646-000.docx
- Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
- File Name: VA786-17-Q-0646 VA786-17-Q-0646_1.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=3706143&FileName=VA786-17-Q-0646-000.docx)
- Record
- SN04609150-W 20170804/170802232317-04d143f60c34408b1e47a6355ff107fb (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |