FBO DAILY - FEDBIZOPPS ISSUE OF AUGUST 09, 2017 FBO #5738
MODIFICATION

Y -- IRRIGATION PIPELINE AND PUMP SYSTEM, BISMARCK PLANT MATERIAL CENTER, BURLEIGH COUNTY, NORTH DAKOTA - Amendment 2

Notice Date
8/7/2017
 
Notice Type
Modification/Amendment
 
NAICS
237110 — Water and Sewer Line and Related Structures Construction
 
Contracting Office
Natural Resources Conservation Service - Contracting Services Branch - Team 3
 
ZIP Code
00000
 
Solicitation Number
AG-3C78-S-17-0034
 
Archive Date
8/29/2017
 
Point of Contact
Ryan F. Lorimer, Phone: 907-761-7744
 
E-Mail Address
ryan.lorimer@wdc.usda.gov
(ryan.lorimer@wdc.usda.gov)
 
Small Business Set-Aside
Total Small Business
 
Description
Interested Vendors List as of 1PM ET 8/7/17 Letter from Land Owner The purpose of this Amendment is to address construction access on private land and to include a copy of the interested vendor's list from FBO.gov as of 1:00PM ET on 8/07/2017. The specifications mention the fact that the pipeline is to be constructed on an existing 10ft wide utility easement. However, access to the site and the land on which the resultant contractor will need to place equipment and materials includes private land not controlled by the NRCS. There are two owners of private land in the affected area. One of the owners has provided a list of conditions to which the contractor must abide. This is provided for your awareness when bidding the project. The NRCS cannot guarantee that these conditions will remain the same. Consequently, bidders are encouraged to submit bids based on the conditions provided in this amendment. Any subsequent change to these conditions by the private landowners that cause an increase in the cost to perform the work called for under this contract will not be paid for by the NRCS. Consequently, the resultant contractor will need to resolve any increased cost between themselves and the private landowners. If the contractor is unable to come to an agreement with the landowner, the contractor should not proceed with the expectation that the NRCS will pay the increased cost, as the NRCS is not obligated to pay any such costs. Performance of any work not approved in advance by the contracting officer will be performed solely at the contractor's risk. Instead, the contractor shall immediately notify the contracting officer so that he or she can provide guidance on how to proceed. All other terms and conditions remain the same.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/7d6079c6ca1dc7d8757805015ac2ac83)
 
Place of Performance
Address: Bismarck, North Dakota, United States
 
Record
SN04615185-W 20170809/170807231244-7d6079c6ca1dc7d8757805015ac2ac83 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.