MODIFICATION
K -- Solicitation Tridium Building Automation System Upgrades Puget Sound Area - Solicitation 1
- Notice Date
- 8/10/2017
- Notice Type
- Modification/Amendment
- NAICS
- 334512
— Automatic Environmental Control Manufacturing for Residential, Commercial, and Appliance Use
- Contracting Office
- General Services Administration, Public Buildings Service (PBS), R10 Design & Construction Contracting (47PL01), 400 15th Street SW, Auburn, Washington, 98001-6599, United States
- ZIP Code
- 98001-6599
- Solicitation Number
- GS-10P-17-LT-SSN-0002
- Point of Contact
- Kimberly M Johnson, Phone: (253) 931-7337, Keith R. Goodsell, Phone: 253-931-7775
- E-Mail Address
-
kimberlym.johnson@gsa.gov, keith.goodsell@gsa.gov
(kimberlym.johnson@gsa.gov, keith.goodsell@gsa.gov)
- Small Business Set-Aside
- N/A
- Description
- Service Contract Act - Wage Determination Past Performance Customer Survey Project Experience Form Price Schedule Exhibit 0 - Read Me First SBU Document Statement of Work HSPD-12 GSA Vendor Fitness Determination Training Manual Document Security for SBU Material SF 1449 Continuation Sheet SF 1449 Request for Quote COMBINED SYNOPSIS/SOLICITATION This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the solicitation; quotes are being requested and a separate written solicitation will not be issued Locations: Nakamura Courthouse (WA0035ZZ) 1010 5th Ave, Seattle, WA 98104 Peace Arch Border Station (WA0132PA) 100 Peace Portal Dr, Blaine, WA 98230 Estimated Period of Performance: 9/15/2017 thru 2/28/2019 (includes See draft Statement of Work attached. Project Magnitude: less than $500,000 Note: Any contractor- provided hardware requiring access to the GSA network, must be pre-approved for use by the GSA (PBS CIO). All IP-enabled devices will be evaluated and scanned to determine any potential IT Security vulnerabilities. GSA will provide a report indicating the required configuration changes to the device that must be made in order for installation to be acceptable and approved. Contractors must make any required configuration changes before their product will be accepted for use. Configuration changes are not a change in scope and are not subject to equitable adjustment under the contract. This process make take 6 months or longer to complete (sometimes upon to a year or more), depending on the lab workload and the number of times a device needs revision to resolve any IT Security vulnerabilities identified. It is expected that both the contractor and GSA will coordinate with the manufacturer regarding these issues, with the solution being provided at no additional cost. The GSA has been working with other name brand BAS equipment manufacturers to resolve similar issues for their equipment. Costs have been borne by the manufacturer in such cases. Work Summary - Contractor shall provide necessary software and labor to create BAS server (Tridium Niagara 4.3 or greater). Server shall be installed and configured on GSA Public Building Services Server Support (PSS) provided virtual servers. Contactor to provide JACE-8000 (Open architecture) supervisory controllers and integrate existing KMC devices. Tridium license shall be "open" and accept traffic from and to all and any brand. License shall allow at least five (5) client session at the same time. KMC supervisory controllers shall be connected to the JACE -8000 controller via twisted pair cable using BacNet MS/TP communication protocol. Provide firmware updates to all IP level networked devices (KMC) to enable the use of BacNet/IP protocol in order to comply with GSA IT policy Standards. Install BAS graphics to allow complete navigation to all HVAC equipment or systems that the BAS controls. See SOW for graphics requirements. Training to government and contractor employees will be a deliverable on the contract. Please submit all technical questions regarding this solicitation in writing to Kimberlym.johnson@gsa.gov no later than August 24, 2017 at 2:00 PM Pacific Time. The Request for Quote (RFQ) form and instructions are enclosed for your use. Quotes are due August 31, 2017 at 4:00 PM (Pacific Time). Please email your proposal and direct all inquiries to the following: Kimberly Johnson, Kimberlym.johnson@gsa.gov. All responding vendors must have a completed registration in the System for Award Management (SAM) website prior to award of contract. Information can be found at https://www.sam.gov/. Interested parties will required to comply with GSA Order 3490.2 regarding safeguard Sensitive but Unclassified building information that will be provided during the solicitation and will be required to complete and return an agreement stating the same before access to some of the information is provided. This project will deliver a solution to move the BAS monitoring equipment onto the GSA Network. The work will be required to be phased as per Contract Line Item Number (CLIN). Each CLIN represents a different building. Expectations: All on site contractor team working onsite will need to be cleared through GSA and OPM. As such, it is requested that you carefully consider the security processing capabilities of your firm and associated subcontractors. The current process is taking approximately 30 to 45 days or more after a fully completed and accurate package is received. Contractor personnel must be prepared to complete online security questionnaires and obtain fingerprinting at one of the local facilities within the greater Seattle region, The Contractor will need to closely cooperate and coordinate with the GSA regarding efforts to plan and perform the work and being provided access to security areas, outages, and other special project related requests. The expectation is that the Contractor will take the necessary actions to resolve all issues in an expeditious and friendly manner. The Contractor will need to closely manage and coordinate with subcontractors. The contractor's detailed planning documents will need to be reviewed by the GSA. The Contractor team must be well versed in all applicable codes, processes, and GSA requirements.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/GSA/PBS/10PDC/GS-10P-17-LT-SSN-0002/listing.html)
- Place of Performance
- Address: Nakamura Courthouse (WA0035ZZ), 1010 5th Ave, Seattle, WA 98104, Peace Arch Border Station (WA0132PA), 100 Peace Portal Dr, Blaine, WA 98230, Washington, United States
- Record
- SN04623336-W 20170812/170810232507-2097add527a2e08a29c01d4cdb642bef (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |