Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF AUGUST 13, 2017 FBO #5742
MODIFICATION

Z -- EWP - Streambank Stabilization - Cole and Drennen Sites, Fayette County, WV - Amendment 3

Notice Date
8/11/2017
 
Notice Type
Modification/Amendment
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Natural Resources Conservation Service - Contracting Services Branch - Specialized
 
ZIP Code
00000
 
Solicitation Number
AG-SPEC-S-17-0053
 
Archive Date
9/1/2017
 
Point of Contact
Laureen M Eipp, Phone: 315-477-6522
 
E-Mail Address
laureen.eipp@wdc.usda.gov
(laureen.eipp@wdc.usda.gov)
 
Small Business Set-Aside
Total Small Business
 
Description
Revised Drawings Revised specification package SF 30 Modification form and revised solicitation pages - 4, 5, and 27 The USDA NRCS is preparing to issue a solicitation for work authorized under the Emergency Watershed Protection Program to relieve imminent hazards to life and property due to a major flood event June 22-29, 2016, impacting Fayette County, West Virginia. The project consists of restoring and stabilizing approximately 112 feet of stream channel on one residential properties in Fayette County, West Virginia. Loose rock riprap will be installed to stabilize and protect the stream banks(s). Disturbed areas will be graded to provide positive drainage and seeded and mulched to provide permanent vegetative cover. If necessary, blockages will be removed to restore channel capacity. The solicitation will be a Total Small Business set-aside. Interested contractors must be registered as Active, and must complete the annual representations and certifications electronically via the System for Award Management (SAM) at http://www.sam.gov in order to be eligible for award. All necessary permits and land rights have been acquired. A firm-fixed price construction contract is anticipated under Simplified Acquisition Procedures. FAR Part 13 and 36 apply. As such, a bid bond is not required and there will be no formal bid opening. A Request for Quotes is being solicited, and can be supplied via fax, email, or regular mail. Award will be made to the lowest priced, responsible offeror. An alternative form of payment protection, either a Payment Bond (SF-25A) or irrevocable letter of credit (ILC), in the amount of 100% of award will be required within 5 days of award. The solicitation package, construction drawings and specifications will be posted and available from this site on August 1, 2017. Requests for quotes, under Simplified Acquisition Procedures, will be due August 16, 2017 at 11 a.m. A site showing to inspect the site will be held on Monday, August 7, 2017 at 10:30 a.m. Participants should plan to meet at the church on Blume Road in Winona, WV. The church is close to the intersection of Blume Road and Route 82. The Latitude and Longitude for the church is 38 degrees 2' 49.79", 80 degrees 59' 27.68". Performance time is 12 calendar days. Magnitude of proposed construction: between $25,000 and $100,000.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/f7708b2a1ebee7791edcb9a7874541f4)
 
Place of Performance
Address: Fayette County, West Virginia, United States
 
Record
SN04624876-W 20170813/170811231845-f7708b2a1ebee7791edcb9a7874541f4 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.