Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF AUGUST 23, 2017 FBO #5752
MODIFICATION

Z -- 3225 Drainage Project - Statement of Work

Notice Date
8/21/2017
 
Notice Type
Modification/Amendment
 
NAICS
238170 — Siding Contractors
 
Contracting Office
Department of the Army, National Guard Bureau, 168 MSG/MSC, AK ANG, 3127 WABASH AVENUE, SUITE 101, EIELSON AFB, Alaska, 99702-1794, United States
 
ZIP Code
99702-1794
 
Solicitation Number
W91ZRU-17-R-0221
 
Response Due
9/8/2017 12:00:00 PM
 
Archive Date
9/23/2017
 
Point of Contact
Jeffery Porter, Phone: 9073778742, Martin Khan, Phone: 9073778741
 
E-Mail Address
jeffery.g.porter2.mil@mail.mil, martin.khan.mil@mail.mil
(jeffery.g.porter2.mil@mail.mil, martin.khan.mil@mail.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
Site Visit Sign-in Sheet. SOW Site Visit Sign-in Sheet - Posted Updated Page 01010-3 of the SOW from: Key Personnel Descriptions: An individual Key Team Member may not hold more than one key role. The following are minimum qualifications for the required key personnel: a. Project Manager: The Contractor's Project Manager shall have either: (1) an engineering degree and 5 years of experience as a Project Manager working on projects similar in size and scope to the solicited project, or (2) 10 years of experience as a Project Manager working on projects similar in size and scope to the solicited project. b. Site Superintendent: The Contractor's Site Superintendent shall have: (1) a minimum of 5 years of experience working on projects similar in size and scope to the solicited project, or (2) 10 years of experience as a Site Superintendent working in general construction areas that included extensive interactions with the Government. c. Quality Control Manager: The QC Manager must be a graduate engineer, graduate architect, or a graduate of construction management, with a minimum of 5 years of construction experience OR a construction person with a minimum of 10 years of experience working on projects similar in size and scope to the solicited project. d. Safety Manager: The Safety and Health Officer shall have a minimum of 5 years of experience working on projects similar in size and scope to the solicited project, and 5 years of experience working with the requirements described in Paragraph 28, SAFETY ASSURANCE TO: Key Personnel Descriptions: An individual Key Team Member may not hold all key roles. Thefollowing are minimum qualifications for the required key personnel: a.Project Manager: The Contractor's Project Manager shall have either: (1) an engineeringdegree and 3 years of experience as a Project Manager working on projects similar insize and scope to the solicited project, or (2) 5 years of experience as a Project Managerworking on projects similar in size and scope to the solicited project. b.Site Superintendent: The Contractor's Site Superintendent shall have: (1) a minimum of 3 years of experience working on projects similar in size and scope to the solicited project,or (2) 2 years of experience as a Site Superintendent working in general constructionareas that included extensive interactions with the Government. c.Quality Control Manager: The QC Manager must be a graduate engineer,graduate architect, or a graduate of construction management, with a minimum of2 years of construction experience OR a construction person with a minimum of 5years of experience working on projects similar in size and scope to the solicitedproject. d.Safety Manager: The Safety and Health Officer shall have a minimum of 3 years ofexperience working on projects similar in size and scope to the solicited project, and 2years of experience working with the requirements described in Paragraph 28,SAFETY ASSURANCE e. The Contractor's construction management key personnel shall be actively involved during the design process to effectively integrate the design and construction requirements of this contract. In addition to the typical required construction activities, the Contractor's involvement includes, but is not limited to, actions such as: integrating the design schedule into the Master Schedule to maximize the effectiveness of fast tracking design and construction (within the limits allowed in the contract), ensuring constructability and economy of the design, integrating the shop drawing and installation drawing process into the design, executing the material and equipment acquisition programs to meet critical schedules, effectively interfacing the construction QC program with the design QC program, and maintaining and providing the design team with accurate, up to date redline and as built documentation. The contractor shall require and manage the active involvement of key trade subcontractors in the above activities
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/NGB/DAHA51-2/W91ZRU-17-R-0221/listing.html)
 
Place of Performance
Address: 168 AW, Bldg 3225, 332 Division St, Eielson AFB, Alaska, 99702, United States
Zip Code: 99702
 
Record
SN04637747-W 20170823/170821231248-1e6b36ac5425dfa3ae38f67f4de64f4f (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.