SOLICITATION NOTICE

Y -- CO FLAP 102(1) and FTFW 112(2) Brainard Lake Road and Bridge

Notice Date
8/21/2017
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH6817B00019
 
Point of Contact
Sheri Muehl, Phone: 7209633351, Jeremiah B. Rogers, Phone: 7209633717
 
E-Mail Address
sheri.muehl@dot.gov, jeremiah.rogers@dot.gov
(sheri.muehl@dot.gov, jeremiah.rogers@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
THIS IS NOT AN INVITATION FOR BID. PLANS AND SPECIFICATIONS ARE CURRENTLY NOT AVAILABLE. THE TENTATIVE ADVERTISEMENT DATE IS SEPTEMBER 5, 2017. THIS PROJECT WILL BE ADVERTISED ON A FULL AND OPEN BASIS. PROJECT DETAILS: CO FLAP 102(1) & FTFS 112(2), Brainard Lake Road and Bridge This project is located in Arapaho Roosevelt National Forest, Boulder County, Colorado. This project includes reconstruction and widening of 2.52 miles of Brainard Lake Road, as well as rehabilitation of a concrete bridge. The project consists of grading, drainage, asphalt pavement pulverization, aggregate base, asphalt pavement, signing, striping, new guardrail, replacement of concrete wingwalls and a precast girder, and epoxy overlay of Brainard Lake Bridge. Type of Construction: grading, widening, asphalt pulverization, drainage, aggregate base, asphalt paving, prefabricated bridge elements, cast in place concrete wingwalls, erosion control, signing and striping, and temporary traffic control. This project consists of: Schedule A: Clearing, grading, Pulverization and paving 2.52 miles of Brainard Lake Road. Significant Items for Schedule A Include: 6.1 miles of slope and grade finish staking, 3,700 LF of silt fence; 700 LF of sediment logs; 11 acres of clearing and grubbing; 32,000 CY of roadway excavation; 1200 cuyd of waste; 18,650 CY of waste, 8,150 tons of aggregate base: 1.5 miles of 24' wide asphalt pulverization; 6,850 tons of asphalt paving; 1,300 LF of pipe culvert placement; 725 lnft of concrete curb; 225 LF of guardrail; 14,800 sqyd of placing conserved topsoil; 7 acres of seeding and bonded fiber matrix; 106,000 lnft of waterborne pavement markings; 1,600 flagger hours ; 800 pilot car hours Option X: Minor bridge rehabilitation of Brainard Lake Bridge Significant Items for Option X include: 40 cuyd of excavation ; 30 cuyd of structure backfill; 1- Removal of precast concrete box girder; 1-placement of new concrete box girder; 21 tons of asphalt paving; 11 cuyd of structural concrete; 39 lnft of remove and reset bridge rail; 91 sqyd of concrete overlay (thin bonded epoxy); 10 lnft of remove and reset stone masonry wall; Estimated total cost for Schedule A and Option X is $3 to $5 million
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH6817B00019/listing.html)
 
Place of Performance
Address: Arapaho & Roosevelt National Forest, Boulder County, Colorado, United States
 
Record
SN04637793-W 20170823/170821231316-321855248dbf84ddf17ed063f3d1fdcc (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.