MODIFICATION
Y -- SIAD Construction Project - Group A (306,307,309,310)
- Notice Date
- 8/25/2017
- Notice Type
- Modification/Amendment
- NAICS
- 236210
— Industrial Building Construction
- Contracting Office
- Department of the Army, Army Contracting Command, ACC - WRN (W56HZV)(DTA), 6501 EAST 11 MILE ROAD, Warren, Michigan, 48397-5000, United States
- ZIP Code
- 48397-5000
- Solicitation Number
- W912GY17R0016
- Point of Contact
- Tyler J. Wonsowicz, Phone: 5862823548
- E-Mail Address
-
tyler.j.wonsowicz.civ@mail.mil
(tyler.j.wonsowicz.civ@mail.mil)
- Small Business Set-Aside
- Competitive 8(a)
- Description
- *****ONLY PERFORMANCE AND PAYMENT BONDS ARE REQUIRED FOR THIS SOLICITATION. BID BONDS ARE NOT REQUIRED.***** *****ALL QUESTIONS NEED TO BE SUBMITTED BY 5PM EST ON AUGUST 7, 2017. NO FURTHER QUESTIONS WILL BE ANSWERED AFTER THIS DATE.***** Army Contract Command - Warren (ACC-WRN) is soliciting for repairs to Buildings 306, 307, 309, and 310 at SIAD, using a firm fixed price C-Type contract. This action will be an 8(a) set-aside, and competed among all capable 8(a) construction companies. Repairs to these buildings are needed over the next year. There are many tasks that must be completed for the buildings to be fully repaired. Some of those tasks include: remove and retain termination bar, remove and retain gutters and all downspouts, repair roof along edge of the gutters, re-install roof termination bar, remove all siding material and replace with new siding, install TYVEK moisture barrier to exterior of the building, remove wood bumper system from perimeter of the buildings, remove existing windows and replace with new vinyl windows, install j-channel and trim accessories as needed around doors, install fanfold insulation, provide and install vinyl trim accessories, apply sealant calking as needed, install a tooled expansion joint, fill joints with exterior grade flexible joint fill product, dispose of waste, remove and replace old damaged concrete ramps, remove and replace existing sliding cargo doors, in addition to more tasks associated with each of these. The Contractor shall provide all labor, materials, equipment, and supervision necessary to complete the work within the Statements of Work (SOW). All work shall be done in a professional workman-like manner and to industrial standards.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/notices/ecbf1d4c4dfd3ce6fd950743906e8fb6)
- Record
- SN04647224-W 20170827/170825231505-ecbf1d4c4dfd3ce6fd950743906e8fb6 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |