Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF SEPTEMBER 30, 2017 FBO #5790
MODIFICATION

Y -- CO FTNP COLM 10(3), Rim Rock Drive - Pavement Report - Solicitation 1

Notice Date
9/28/2017
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH6817B00018
 
Response Due
10/31/2017 2:00:00 PM
 
Point of Contact
Sheri Muehl, Phone: 7209633351
 
E-Mail Address
sheri.muehl@dot.gov
(sheri.muehl@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
Plans Solicitation / IFB Geotech Report Pavement Report THIS IS A REQUEST FOR BID - PLANS AND SPECIFICATION ARE AVAILABLE. PROJECT DETAILS: This project in includes reconstruction of a 4.7 miles of the Rim Rock Drive in Colorado National Monument. Type of Construction: grading, culverts, concrete headwalls, and riprap, aggregate base course, asphalt pulverizing and paving, traffic control, public information. This project consists of: Schedule A: Phased Construction of 3.7 miles of roadway reconstruction and paving. Significant Items for Schedule A Include: 500 LF of fiber rolls; 4,000 CY of roadway embankment; 1,500 sub excavation; 300 cuyd of riprap; 2,000 tons of aggregate base; 8,500 tons of hot asphalt paving; 120 LF of pipe culvert placement; 500 LF of guardrail; 150,000 linear feet of pavement markings; 1,500 flagger hours Option X: Phased Construction of.5 miles of roadway reconstruction and paving. Significant Items for Option X Include: 100 LF of fiber rolls; 2,000 CY of roadway excavation; 400 cuyd excavation waste; 50 cuyd of riprap; 2,000 tons of aggregate base; 2,300 tons of hot asphalt paving; 50 LF of pipe culvert placement;.05 miles of pavement markings; 200 flagger hours. Option Y: Phased Construction of.4 miles of roadway reconstruction and paving. Significant Items for Option Y Include: 50 LF of fiber rolls; 1,000 CY of roadway excavation; 400 cuyd excavation waste; 50 cuyd of riprap; 2,000 tons of aggregate base; 2,000 tons of hot asphalt paving; 30 LF of pipe culvert placement;.04 miles of pavement markings; 200 flagger hours. Estimated total cost is $4 million to $6 million, depending on the Schedule and Options awarded.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH6817B00018/listing.html)
 
Place of Performance
Address: Colorado National Monument, Mesa County, Fruita, Colorado, 81521, United States
Zip Code: 81521
 
Record
SN04698352-W 20170930/170928231730-459766b6785a1dea590406cc5aacbc45 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.