AWARD
Y -- Building 24761 and 34762 UPS Replacement, Kirtland Air Force Base, Bernalillo County, New Mexico
- Notice Date
- 9/29/2017
- Notice Type
- Award Notice
- NAICS
- 238210
— Electrical Contractors and Other Wiring Installation Contractors
- Contracting Office
- Department of the Army, U.S. Army Corps of Engineers, USACE District, Albuquerque, Attn: CESPA-CT, 4101 Jefferson Plaza NE, Albuquerque, New Mexico, 87109-3435, United States
- ZIP Code
- 87109-3435
- Solicitation Number
- W912PP17T0132
- Archive Date
- 10/14/2017
- Point of Contact
- Karen Irving, Phone: 505-342-3356
- E-Mail Address
-
karen.k.irving@usace.army.mil
(karen.k.irving@usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W912PP17P0130
- Award Date
- 9/29/2017
- Awardee
- QA Engineering, LLC, 4700 Lincoln Rd NE, Albuquerque, New Mexico 87109, United States
- Award Amount
- 40805.00
- Line Number
- 0001
- Description
- a. PHETS OPS Building (H34762) UPS: 1. Disconnect the 2 UPS units (Model #SY12KEX-PDBX1) located in the calibration lab (H34761) and relocate to storage room in the PHETS OPS Building H34762. One unit will be stored in this room the other will be polaced into service (in this room) via this scope of work. Remove the existing feed from panel PP-1 to Panel LP-1. Relocate circuits PP1-1, 2, 2, 5, 6, 7 and 37 to panel LP1. Install a new 100A 3P C/B in Panel PP1, and run new feeder from PP1 to the storage room where the UPS units are now located (UPS Input). Refeed panel LP-1 from the storage room (UPS Output). Install a 120V emergency fixture above PP-1 feed from a dedicated CKT in panel PP-1 (Label "power out when on"). See the attached one-line diagram. b. PHETS Calibration Lab (H37461) UPS: 1. Take the 2 UPS units (Model #SY12KEX-PDBX1) out of service and relocate as previously instructed. Demo the existing feeds to panels UPS-1 & UPS-2 ( this includes the line side of the UPS Units). Remove the 2-2pole C/B in panel PP-1 that feed UPS-1 & UPS-2, and install a 3P 8-0A C/B in PP-1 to feed the provided UPS unit (APC smart -UPS VT 20 KVA Model #3SUVTP20K4B4S). Install provided UPS unit and extend feeder to new 100A 120/208V 3 phase 30 CKT MLO Panel. Relocate the 9 CKTS from PNL Ups-1 and the 10 CKT from PNL UPS-2 to the new 100A 3 phase PNL. Demo existing UPS Panel. See the attached one line diagram.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA47/Awards/W912PP17P0130.html)
- Record
- SN04700605-W 20171001/170929231333-613fe6cd2ffd24a27adfebded8638fa9 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |