Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF OCTOBER 01, 2017 FBO #5791
AWARD

Y -- Building 24761 and 34762 UPS Replacement, Kirtland Air Force Base, Bernalillo County, New Mexico

Notice Date
9/29/2017
 
Notice Type
Award Notice
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Albuquerque, Attn: CESPA-CT, 4101 Jefferson Plaza NE, Albuquerque, New Mexico, 87109-3435, United States
 
ZIP Code
87109-3435
 
Solicitation Number
W912PP17T0132
 
Archive Date
10/14/2017
 
Point of Contact
Karen Irving, Phone: 505-342-3356
 
E-Mail Address
karen.k.irving@usace.army.mil
(karen.k.irving@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912PP17P0130
 
Award Date
9/29/2017
 
Awardee
QA Engineering, LLC, 4700 Lincoln Rd NE, Albuquerque, New Mexico 87109, United States
 
Award Amount
40805.00
 
Line Number
0001
 
Description
a. PHETS OPS Building (H34762) UPS: 1. Disconnect the 2 UPS units (Model #SY12KEX-PDBX1) located in the calibration lab (H34761) and relocate to storage room in the PHETS OPS Building H34762. One unit will be stored in this room the other will be polaced into service (in this room) via this scope of work. Remove the existing feed from panel PP-1 to Panel LP-1. Relocate circuits PP1-1, 2, 2, 5, 6, 7 and 37 to panel LP1. Install a new 100A 3P C/B in Panel PP1, and run new feeder from PP1 to the storage room where the UPS units are now located (UPS Input). Refeed panel LP-1 from the storage room (UPS Output). Install a 120V emergency fixture above PP-1 feed from a dedicated CKT in panel PP-1 (Label "power out when on"). See the attached one-line diagram. b. PHETS Calibration Lab (H37461) UPS: 1. Take the 2 UPS units (Model #SY12KEX-PDBX1) out of service and relocate as previously instructed. Demo the existing feeds to panels UPS-1 & UPS-2 ( this includes the line side of the UPS Units). Remove the 2-2pole C/B in panel PP-1 that feed UPS-1 & UPS-2, and install a 3P 8-0A C/B in PP-1 to feed the provided UPS unit (APC smart -UPS VT 20 KVA Model #3SUVTP20K4B4S). Install provided UPS unit and extend feeder to new 100A 120/208V 3 phase 30 CKT MLO Panel. Relocate the 9 CKTS from PNL Ups-1 and the 10 CKT from PNL UPS-2 to the new 100A 3 phase PNL. Demo existing UPS Panel. See the attached one line diagram.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA47/Awards/W912PP17P0130.html)
 
Record
SN04700605-W 20171001/170929231333-613fe6cd2ffd24a27adfebded8638fa9 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.