FBO DAILY - FEDBIZOPPS ISSUE OF OCTOBER 06, 2017 FBO #5796
SOURCES SOUGHT

Z -- Chesapeake City Bridge Miscellaneous Repairs

Notice Date
10/4/2017
 
Notice Type
Sources Sought
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Philadelphia, 100 Penn Square East, Wanamaker Bldg (RM 643), Philadelphia, Pennsylvania, 19107-3390, United States
 
ZIP Code
19107-3390
 
Solicitation Number
W912BU17ChesapeakeCityBridge
 
Archive Date
10/26/2017
 
Point of Contact
Kellee J. Haye, Phone: 2156566924, Gregory C. Keaton, Phone: 215-656-3826
 
E-Mail Address
Kellee.J.Haye@usace.army.mil, gregory.c.keaton@usace.army.mil
(Kellee.J.Haye@usace.army.mil, gregory.c.keaton@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
SUBJECT: Chesapeake City Bridge Miscellaneous Repairs 1. IFB Number: TBD 2. Notice appears in FedBizOpps: 17 Oct 2017 3. Date Solicitation Documents Available: 7 Nov 2017 4. Offers to be received: 07 Dec 17 Time: 11:00 AM 5. Time for Completion (Calendar Days): 180 Days 6. Project Title and Location: Chesapeake City Bridge Miscellaneous Repairs, Chesapeake City, MD 7. Estimated Cost Range: $500,000 to $1,000,000 8. Offers Covering Project Restricted to Small Business: Yes 9. Description of Work: Replacing drainage trough system below finger type expansion joints on bridge approach spans. Existing drainage trough system consists of a semicircular asbestos cement pipe with a canvas flap draped down into it to catch runoff that passes through the finger joint above. The semicircular pipe is supported by metal brackets that are welded to the end floor beams of each span. The canvas flap is clamped between the bottom flange of a diaphragm and a clamp angle. The pipe, canvas, and pipe brackets will all be demolished and a new drainage trough system will be installed. Drainage troughs are accessible from below using a man lift to reach the tops of the piers and standing between the end floor beams. When possible, all work should be done from below to mitigate the need for a lane closure on the bridge.  Additional work includes miscellaneous steel repairs and retrofitting sliding plate type joint on sidewalk with a watertight foam expansion joint
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA61/W912BU17ChesapeakeCityBridge/listing.html)
 
Record
SN04706496-W 20171006/171004231510-09acf2c85d4560f331b9b27e146b6da2 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.