Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF NOVEMBER 06, 2017 FBO #5827
SOLICITATION NOTICE

Z -- Eagle Creek Suspension Bridge Removal - 12-046W-18-Q-0003

Notice Date
11/4/2017
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
238990 — All Other Specialty Trade Contractors
 
Contracting Office
Department of Agriculture, Forest Service, R-6 Contracting North - Mt. Hood NF/Columbia River Gorge National Scenic Area, 16400 Champion Way, Sandy, Oregon, 97055, United States
 
ZIP Code
97055
 
Solicitation Number
12-046W-18-Q-0003
 
Archive Date
12/7/2017
 
Point of Contact
Roxanne D. Anderson, Phone: 5036681730
 
E-Mail Address
rdanderson@fs.fed.us
(rdanderson@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
Experience Questionnaire Historical Site Photos Site Photos Wage Determination Drawings for informational purposes Solicitation 12-046W-18-Q-0003 This solicitation is being advertised as a firm-fixed price contract. This work consists of removal and disposal of the Eagle Creek suspension Bridge and railing adjacent to approaches. Furnish all labor, equipment, supplies, supervision, and transportation necessary to perform this contract. The bridge is a wire cable suspension bridge with steel suspenders attached to treated timber elements such as Needle Beams, Stringers, Deck and Railing. The Bridge partially collapsed in September of 2017 and was further damaged by a storm event mid-October, 2017. The bridge was reconstructed in 1997 with Plans R34601-ALL attached for reference. Also included are photos of similar demolition by mobile crane removal from 1997 as well as 2017 photos of recent condition. The upstream cable has failed near the northeast anchor block. The other main suspension cable remains suspending most of the failed structure but its condition and structural capacity is unknown. The northeast tower has rotated off 2 of the 3 pedestal supports and is unstable. All concrete foundations and anchor assemblies are to remain in place except for salvage of a single anchor assembly. All suspension cables, suspenders, hardware and pressure treated wood elements are to be removed and disposed of off National Forest System Lands. Disassemble and remove in a manner that does not alter flowing water or scarify the stream channel, gravel bars, banks or flood plain. Machinery and debris shall not be allowed in the active stream. Use of the gravel bar for staging and by machinery is allowed if not covered in water. Any vegetation cleared from gravel bar to facilitate operations is to be slash piled in an area above the high water mark and approved by the CO. Likely east of the southwest tower location.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/467/12-046W-18-Q-0003/listing.html)
 
Place of Performance
Address: Within the Columbia River Gorge National Scenic Area: The Eagle Creek Suspension Trail Bridge is located east of Portland, OR, and 0.2 miles southeast of exit 41 of I-84 at Lat/Long: 45.639948, -121.923841, Multnomah County, Oregon, United States
 
Record
SN04732027-W 20171106/171104230058-a9688295f76e55fbdf8abb23349f9793 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.