Z -- Replace Generator Cables and Cooling System - Solicitation, Plans, and Specifications

Notice Date
11/7/2017
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Little Rock, Attn: CESWL-CT, PO Box 867, Little Rock, Arkansas, 72203-0867, United States
 
ZIP Code
72203-0867
 
Solicitation Number
W9127S-18-R-0008
 
Archive Date
10/1/2018
 
Point of Contact
Robert E.Buchanan, Phone: 5013401257
 
E-Mail Address
robert.e.buchanan@usace.army.mil
(robert.e.buchanan@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
Specification for Solicitation W9127S18R0008 / Presolicitation W9127S-17-R-0001 Plans for Solicitation W9127S18R0008 / Presolicitation W9127S-17-R-0001 Solicitation W9127S18R0008 to Presolicitation W9127S-17-R-0001 W9127S-18-R-0008 is the Solicitation to Presolicitation W9127S-17-R-0001. The number change is due to the fiscal year changeover. To view the Presolicitation information please view W9127S-17-R-0001. The work to be performed under this Contract, for generator cables, consists of removing and disposing of the existing High Pressure Fluid-Filled pipe-type cable system and supports, and furnishing and installing a new system of solid dielectric cable in cable tray, reusing the existing pothead enclosures with minor modifications. There are four circuits in the system, paired such that two main unit circuits are connected to each main power transformer. Each circuit is a parallel run of conductors in separate raceway. Circuits must be deenergized in pairs, such that Units 1 & 2 continue to feed Transformer T1 while the circuits from Units 3 & 4 to Transformer T2 are replaced on one side of the Power Tunnel, and likewise after the circuits from Units 3 & 4 to Transformer T2 have been re-energized and accepted, the circuits from Units 1 & 2 to Transformer T1 may be de-energized and replaced on the opposite side of the Power Tunnel. The work to be performed under this Contract, for the cooling system, consists of removing and disposing of the existing cooling system and supports, and furnishing and installing a new system including all fans, ductwork, piping, coolers, electrical, and controls.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA03/W9127S-18-R-0008/listing.html)
 
Place of Performance
Address: Missouri, United States
 
Record
SN04733825-W 20171109/171107231249-0db18f2706aa1326a9d2d58311a4e642 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.