SOLICITATION NOTICE
59 -- Repair of Oscillator, KU BIT Non-Crystal - Performance Work Statement
- Notice Date
- 11/7/2017
- Notice Type
- Presolicitation
- NAICS
- 811213
— Communication Equipment Repair and Maintenance
- Contracting Office
- Department of the Air Force, Air Force Materiel Command, PK/PZ - Robins AFB, 215 Page Rd, Robins AFB, Georgia, 31098-1611, United States
- ZIP Code
- 31098-1611
- Solicitation Number
- FA8524-18-R-0005
- Archive Date
- 12/22/2017
- Point of Contact
- CoStella D. Edwards, Phone: 478-926-0167, Mellissa Smith, Phone: 478-926-0151
- E-Mail Address
-
costella.edwards@us.af.mil, mellissa.smith@us.af.mil
(costella.edwards@us.af.mil, mellissa.smith@us.af.mil)
- Small Business Set-Aside
- N/A
- Description
- Performance Work Statement for Repair of Oscillator KU BIT Non-Crystal This requirement is for the procurement of repair for the Ku Antenna BIT Oscillator, NSN 5955-01-383-2748SO, P/N 881554-6 is used on the Combat Talon II APQ-170 Radar System. The built in test (BIT) oscillator is installed in the KU-band antenna line replaceable unit (LRU). The purpose of the oscillator is to inject pulsed radio frequency (RF) signal into one of two antenna feeds. The oscillator is only active during antenna turn-around time (approx. 100ms/s) in a backup mode of operation and for commanded radar BIT mode signal. This effort will be executed as a Firm Fixed Price Indefinite Delivery Contract (IDC) Requirements contract, consisting of a Basic and 4 annual ordering periods for a total of 5 years. The place of delivery is To Be Determined (TBD) and assets are due 120 days After Receipt of Order (ARO). The RFP will be posted to the Federal Business Opportunities (FBO) website. Electronic procedures will be used for this solicitation at www.fedbizopps.gov only. NO TELEPHONE REQUESTS WILL BE HONORED and no hard copies will be mailed out. This is a sole source requirement that will be purchased from Crane Electronics, INC.(33025), in accordance with FAR 6.302-1, Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements. All responsible sources may submit a capability statement, proposal, or quotation which shall be considered by the agency. No data is available. All questions regarding the RFP must be submitted in writing to costella.edwards@us.af.mil with a copy to mellissa.smith@us.af.mil. No telephones inquiries. Anticipated award date is 31 January 2018. Duration of Contract Period is 5 years.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AFMC/WRALC/FA8524-18-R-0005/listing.html)
- Record
- SN04733930-W 20171109/171107231327-5ab9c6f2f8feb24937da3080b835cfe2 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |