MODIFICATION
99 -- Plates, Rods, Plating, Finishing - Amendment 2
- Notice Date
- 11/13/2017
- Notice Type
- Modification/Amendment
- NAICS
- 332813
— Electroplating, Plating, Polishing, Anodizing, and Coloring
- Contracting Office
- Department of the Army, Army Contracting Command, ACC - APG (W25G1V) Tobyhanna, 11 HAP ARNOLD BLVD, TOBYHANNA ARMY DEPOT, Pennsylvania, 18466-5107, United States
- ZIP Code
- 18466-5107
- Solicitation Number
- W25G1V18Q0030
- Archive Date
- 11/28/2017
- Point of Contact
- Kimberly M. Jurkiewicz, Phone: 5706157066
- E-Mail Address
-
kimberly.m.jurkiewicz.civ@mail.mil
(kimberly.m.jurkiewicz.civ@mail.mil)
- Small Business Set-Aside
- Total Small Business
- Description
- The reason for the amendment is to clarify the number of days in which the first article quantities need to be submitted is being changed from 30 days to 45 days. A quantity of 5 each of each part within 45 days of purchase order must be provided to TYAD for inspection and approval to full run production. ROBOTIC DEPLOYMENT SYSTEM (RDS) 016423327 OUTSOURCE PERFORM LIQUID NITRIDING ARCOR WORK TYAD WOULD LIKE TO OUTSOURCE VARIOUS MACHINING AND FINISHING FOR THE RDS PROGRAM. THE PARTS ARE PRIMARILY LATHE AND CNC MACHINE WORK. ELEVEN (11) PARTS REQUIRE ELECTROLESS NICKEL PLATING, THREE (3) PARTS REQUIRE MELONITE FINISH AND THREE (3) PARTS WILL BE RETURNED TO TYAD UNFINISHED. TYAD IS REQUESTING THAT THE VENDOR PURCHASES THE RAW MATERIAL, FABRICATES THE PIECES TO THE DRAWING SPECIFICATIONS, AND PROVIDES A FINISHED PART (WITH PLATING, MELONITE) AS THE DRAWING INDICATES. PLEASE REFER TO THE ATTACHED STATEMENT OF WORK, AND ENCLOSURE WITH QUANTITIES OF EACH PART (ALL OF THE ATTACHMENTS/ENCLOSOURES ARE LOCATED IN SECTION 'C' OF THIS SOLICITATION ATTENTION- DRAWINGS CAN ONLY BE RELEASED TO A VENDOR UPON WRITTEN REQUEST AND WITH CONFIRMATION OF A CURRENT REGISTRATION IN SAM AND AN ACTIVE JCP CERTIFICATION THAT INCLUDES PROOF OF A CERTIFICATION NUMBER AND EXPIRATION DATE AS STATED BELOW. The drawings for this requirement are an attachment to the RFQ; however, critical technology restrictions apply to the release of these drawings. Therefore, interested sources shall have an active registration in the System for Award Management (SAM) and also an active Joint Certification Program (JCP) certification. The primary means of verifying JCP registration will be through https://public.logisticsinformationservice.dla.mil/jcp/search.aspx A first article of a quantity of 5 each of each part within 45 days of purchase order must be provided to TYAD for inspection and approval prior to full run production. PRIMARY TOBYHANNA POINT OF CONTACT: MIKE COOK, 570-615-7984 EMAIL: MICHAEL.L.COOK8.CIV@MAIL.MIL ALTERNATE TOBYHANNA POINT OF CONTACT: JENNY BATTENBERG, ENGINEER PHONE: 570-615-5804 EMAIL: JENNY.BATTENBERG.CIV@MAIL.MIL WAWF ACCEPTOR: MARTIN.J.NEALON.CIV@MAIL.MIL RETURN ADDRESS TO SHIP PARTS BACK TO TOBYHANNA ARMY DEPOT: Tobyhanna Army Depot Attn: MIKE COOK, 5-7984 TOBYHANNA ARMY DEPOT BLDG. 1C- BAY 6 11 HAP ARNOLD BLVD. TOBYHANNA, PA 18466 BASIS OF AWARD: THE AWARD WILL BE BASED ON PRICE. NOTE- IF UNABLE TO MEET THE MINIMUM REQUIRED DELIVERY DATE BID WILL NOT BE CONSIDERED. MUST BID ALL 17 LINES FOR BID TO BE ACCEPTED - 'BID ALL LINES OR NONE' MINIMUM REQUIRED DELIVERY DATE: 150 DAYS AFTER ORDER *Quote must be broken down by cost/part, the lead time of when the part(s) would be completed, and the cost of shipping.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/notices/e2c6ecd76eb06ca98b43cecccfe70727)
- Record
- SN04739033-W 20171115/171113231515-e2c6ecd76eb06ca98b43cecccfe70727 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |