Y -- NV FLAP 100(1), Sierra Vista Lane - Solicitation 1

Notice Date
11/15/2017
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH6817B00028
 
Archive Date
12/29/2017
 
Point of Contact
Donald Peters, , Sheri Muehl,
 
E-Mail Address
CFLContracts@dot.gov, CFLContracts@dot.gov
(CFLContracts@dot.gov, CFLContracts@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
Hydraulics Report NV FLAP 100(1) Sierra Vista Lane Plans NV FLAP 100(1) Sierra Vista Lane Geotechnical and Pavement Report- NV FLAP 100(1) Sierra Vista Lane IFB NV FLAP 100(1) Sierra Vista Lane The project will reconstruct a 2.5-mile portion of Sierra Vista Lane using full depth reclamation with an asphalt concrete pavement overlay. Some earthwork is required in areas with drainage improvements. In addition, two existing parking areas will be improved with gravel surfacing and wayfinding signs to improve recreational access for visitors to federal lands. Signing along Sierra Vista Lane will be improved to meet current standards. The last major component to this project is efforts to stabilize the bank of Carson River with riprap slope protection where it is close to the road and showing signs of erosion and degradation. Schedule A: Approximate Quantities Embankment Construction: 11,500 CUYD Placed Riprap: 2,000 CUYD Roadway Aggregate: 4,000 TON Full Depth Reclamation: 2.5 MILE Asphalt Concrete Pavement: 5,600 TON Pipe Culverts ranging from 18 to 48-inch: 1,200 LNFT Concrete Curb and Gutter: 3,700 LNFT It is anticipated that the project will be advertised in November, 2017. Construction is anticipated to occur from January, 2018 to May, 2018. Estimated total cost is $1 million to $5 million.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH6817B00028/listing.html)
 
Place of Performance
Address: The project is located just outside of Carson City, Nevada 89701. The project elevation is approximately 4600 feet., Carson City, Nevada, United States
 
Record
SN04741647-W 20171117/171115231616-8d81f3a5af7bff3f6139acf36c0b85b6 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.