Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF DECEMBER 01, 2017 FBO #5852
MODIFICATION

Y -- HI STP SR11(1) & SR11(2) Hilea & Ninole Stream Bridges - Solicitation 1

Notice Date
11/29/2017
 
Notice Type
Modification/Amendment
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Transportation, Federal Highway Administration (FHWA), Central Federal Lands Highway Division, 12300 West Dakota Avenue, Lakewood, Colorado, 80228
 
ZIP Code
80228
 
Solicitation Number
DTFH6817B00024
 
Response Due
1/16/2018 2:00:00 PM
 
Point of Contact
Sheri Muehl, Phone: 7209633351
 
E-Mail Address
sheri.muehl@dot.gov
(sheri.muehl@dot.gov)
 
Small Business Set-Aside
N/A
 
Description
Ninole Hydraulics Report Hilea Hydraulics Report Ninole Geotechnical Report Hilea Geotechnical Report Plan Set Solicitation Document THIS IS AN INVITATION FOR BID - PLANS AND SPECIFICATIONS ARE AVAILABLE. PROJECT DETAILS: HI STP SR11(1) and SR11(2) Hilea and Ninole Stream Bridges The Central Federal Lands Highway Division (CFL) of the Federal Highway Administration in partnership with the Hawaii Department of Transportation, is soliciting interest for an upcoming bridge replacement project on the Big Island of Hawaii. The proposed project is located on Mamalahoa Highway (State Route 11), between MP 56.7 (Ninole Bridge) and MP 57.7 (Hilea Bridge) near the Southern tip of the island. The principle bid items include the following: 6500 cubic yards of structural concrete; 730 linear foot of precast, pre-stressed girders, 635 linear foot of precast, pre-stressed concrete slab, 420,000 pounds of reinforcing steel, 6,000 cubic yards of structural excavation; 4,500 cubic yards of roadway excavation; 1400 tons of roadway aggregate; 700 tons of asphalt pavement; Contractor quality control, lump sum; Contractor Testing, lump sum; Construct and Maintain roadway by-pass (two temporary bridges with roadway approaches), lump sum; 6,000 square yard of geosynthetic reinforcement; Removal of Bridge (two bridges), lump sum; and other incidental items of work related to roadway/bridge improvement projects including, soil erosion control, roadway signage and striping, temporary traffic control, and seeding and mulching. The Notice to Proceed for on-site activity will be issued in January, 2018 at the discretion of FHWA-CFLHD. Estimated total cost is $13 million to $18 million.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FHWA/68/DTFH6817B00024/listing.html)
 
Place of Performance
Address: Mamalahoa Highway, Route 11 District of Kau, Hawaii County, Hawaii, United States
 
Record
SN04751059-W 20171201/171129230750-cd90f96b954dc2bd1df9506674081117 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.