Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF DECEMBER 08, 2017 FBO #5859
SOURCES SOUGHT

Y -- Design-Build of Base Facilities at Camp John Pratt in Mazar-E-Sharif, Afghanistan

Notice Date
12/6/2017
 
Notice Type
Sources Sought
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE Middle East District, Attn: CETAC-PD-CT, 201 Prince Frederick Drive, Winchester, Virginia, 22602-5000, United States
 
ZIP Code
22602-5000
 
Solicitation Number
W5J9JE-18-R-0006
 
Archive Date
3/15/2018
 
Point of Contact
CELIA E. COCKBURN, Phone: 5407234885
 
E-Mail Address
celia.e.cockburn@usace.army.mil
(celia.e.cockburn@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
December 6, 2017 Title: Design-Build of Base Facilities at Camp John Pratt in Mazar-E-Sharif, Afghanistan Solicitation Number: W5J9JE-18-R-0006 Project Number: ANA-18-064 Description: SOURCES SOUGHT SYNOPSIS The U.S. Army Corps of Engineers, Transatlantic Afghanistan District, will be issuing a full and open, competitive Request for Proposal (RFP) for a design-build construction project titled "Design-Build of Base Facilities at Camp John Pratt in Mazar-E Sharif, Afghanistan." This will be a two-phase Best Value, Trade-Off source selection procurement pursuant to FAR Parts 15 and 36. This project requires the contractor to design and build new utilities infrastructure and facilities at Camp John Pratt in Mazar-E Sharif. New utilities to be provided include electrical power, communications (e.g. telephone and internet), potable water, waste water, and site drainage. New facilities to be constructed include barracks (x15), latrines (x3), laundries (x5), dining facilities (x2), fitness center (x1), medical clinic (x1), headquarters buildings (x3), tactical operations center (x1), logistics building (x1), classrooms (x5), vehicle maintenance facility (x1), fire station (x1), small arms storage (x3), storage buildings (x4), electric power generation plant with refueling station, water supply system with well house, waste water treatment plant, entry control point and perimeter fence. All facilities will be delivered complete and ready for occupation. Estimated Construction costs: Between $10,000,000 and $25,000,000 Phase 1 of the solicitation is expected to be issued on or about 15 December 2017 with proposals due on or about 09 January 2018. The following will be the Phase 1 technical evaluation factors: Factor 1 - Key Personnel Factor 2 - Specialized Experience Only proposals from offerors determined to be base access eligible by the Joint Contingency Contracting System (https://www.jccs.gov/) at the time of proposal due date, shall be evaluated. The North American Industry Classification System (NAICS) Code is 236220. All firms and prime contractors doing business with the Federal Government shall be registered in the System for Award Management (SAM) database at www.sam.gov prior to award of a contract. Primary POC: Nikisha Cook, Secondary POC: Mary Harding, mary.j.harding@usace.army.mil
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA78/W5J9JE-18-R-0006/listing.html)
 
Place of Performance
Address: Mazar-E- Sharif, Afghanistan, Afghanistan
 
Record
SN04759373-W 20171208/171206231637-2747efc6bcb4d29f90197b4979a80da9 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.