SOURCES SOUGHT

Z -- East Inlet Wall Concrete Repairs

Notice Date
12/7/2017
 
Notice Type
Sources Sought
 
NAICS
238110 — Poured Concrete Foundation and Structure Contractors
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, New England, 696 Virginia Road, Concord, Massachusetts, 01742-2751, United States
 
ZIP Code
01742-2751
 
Solicitation Number
W912WJ18X0012
 
Point of Contact
Jessica Loc, Phone: 9783188678
 
E-Mail Address
jessica.r.loc@usace.army.mil
(jessica.r.loc@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
The U.S. Army Corps of Engineers, New England District, is issuing a Sources Sought Announcement for East Inlet Wall Concrete Repairs at Franklin Falls Dam, Franklin, NH. This announcement is to determine the interest, availability, and capability of 8(a), HUBZone, Service-Disabled Veteran-Owned, Women-Owned and Small Business concerns as described below. The NAICS code for this procurement is 238110. The project is planned to be issued on or about April, 2018. The project will occur in the summer/fall of 2018 and is expected to take about 3 months, including submittal approval. The estimated construction cost is between $500,000 and $1,000,000. This project consists of completing the following tasks: • Demolition of entire failing concrete surface of inlet wall above the water line to a minimum depth of 3 inches • Shotcrete application to entire surface of inlet wall above the water line with welded wire reinforcement and shear anchors • Excavating approximately 14 feet down to impervious layer behind existing inlet wall and installation of drain and crushed fill • Backfilling excavation meeting specified gradation and compaction requirements The Corps of Engineers constructed Franklin Falls Dam in 1943 and the project has been in service for 74 years. The rolled earth fill dam is 1,740 feet long with a maximum height above streambed of 140 feet and a crest width of 35 feet. The dam is operated to reduce flooding in the downstream communities of Franklin and Penacook, and, in conjunction with Hopkinton-Everett, Blackwater, and Edward MacDowell reservoirs, to reduce flooding on the main stem of the Merrimack River. The east inlet wall at Franklin Falls Dam is approximately 375 feet long and extends above the water line approximately 25 feet. All demolition and shotcrete work shall take place above the normal pool level and will require working above water. Demolition debris shall not be allowed to enter the inlet channel and shall be removed from the site by the contractor. No dewatering of the inlet channel shall take place during construction. Excavation material may be temporarily placed adjacent to the excavation, and excess material after backfilling will be placed onsite. Interested firms should submit a capabilities package to include the following: business classification (e.g. HUBZone, etc.) a proof of bonding as well as what type of equipment would be utilized for this project. Additionally, firms must demonstrate their project experience, within the last five (5) years, in the areas listed below. Please indicate the team subcontractor(s) (if any), including their prior experience and qualifications, which will be used to support the offeror's effort. Subcontractor's experience must also have been performed within the last five (5) years. 1. Excavation to at least a 14 foot depth including trenching, excavation support (if needed) and backfilling of materials with proper compaction equipment and techniques. 2. Performance of material testing and density testing (laboratory and field testing). 3. Partial depth demolition of concrete structure, surface preparation, and placement of reinforcing. 4. Wet-Mix shotcrete application on a vertical surface of at least 1200 square feet. The Government anticipates including a Definitive Responsibility Criteria in the solicitation and contract resulting from this market research. After bid opening but prior to award, the apparent low bidder will be required to furnish documentation that the prime contractor or subcontractor meet the work experience listed above. All shotcrete work shall be performed by an ACI-certified Shotcrete Nozzlemen (Wet-Mix Process) or an ACI-certified Shotcrete Nozzleman-in-Training (Wet-Mix Process) under the direct supervision of an ACI-certified Shotcrete Nozzleman (Wet-Mix Process). Responses are due 11 January 2017. Responses should be addressed to the U.S. Army Corps of Engineers, New England District, 696 Virginia Road, Concord, MA 01742-2751, ATTN: Jessica Loc ( Jessica.r.Loc@usace.army.mil ). The Government will not pay for any material provided in response to this market survey nor return the data provided. This notice is for information purposes only and is not a request to be placed on a solicitation mailing list nor is it a Request for Proposal (RFP) or an announcement of a solicitation. The results of this survey will be considered to be in effect for a period of one year from the date of this notice.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA33/W912WJ18X0012/listing.html)
 
Place of Performance
Address: East Inlet Wall Concrete Repairs at Franklin Falls Dam, Franklin, New Hampshire, United States
 
Record
SN04760601-W 20171209/171207231425-c433df83022a966707e126e0c84c361c (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.