FBO DAILY - FEDBIZOPPS ISSUE OF FEBRUARY 14, 2018 FBO #5927
SOLICITATION NOTICE

Y -- Multnomah Creek Trail Bridge Replacement

Notice Date
2/12/2018
 
Notice Type
Presolicitation
 
NAICS
237310 — Highway, Street, and Bridge Construction
 
Contracting Office
Department of Agriculture, Forest Service, R-6 Contracting North - Mt. Hood NF/Columbia River Gorge National Scenic Area, 16400 Champion Way, Sandy, Oregon, 97055, United States
 
ZIP Code
97055
 
Solicitation Number
12-046W-18-R-0003
 
Archive Date
3/15/2018
 
Point of Contact
Roxanne D. Anderson, Phone: 5036681730
 
E-Mail Address
rdanderson@fs.fed.us
(rdanderson@fs.fed.us)
 
Small Business Set-Aside
Total Small Business
 
Description
MULTNOMAH CREEK TRAIL BRIDGE REPLACEMENT STATEMENT OF WORK This statement of work covers the replacement of a fallen tree and wild fire damaged trail bridge. The bridge is located in the CRGNSA on trail #441 at M.P. 1.9 (45.57139167, -122.10596944). By ground, the bridge is only accessible by trail. Presently the site is closed to the public. A prebid site visit date will be specified. This will be the only opportunity to visit the site during the bidding period. The project to replace Multnomah Creek trail bridge includes the following elements of work to be performed: 1) Removal of the existing damaged trail bridge superstructure. The existing trail bridge is a 60 foot span x 3 foot wide galvanized steel truss with pressure treated wood deck bridge superstructure on cast in place concrete and concrete filled pipe abutments. The wood components of the bridge were heavily burned in the fire and most no longer exist. Only the superstructure is to be removed. The abutment substructures are to remain in-place. The damaged superstructure is to be disconnected from the substructure by removal of the anchor bolt nuts or cutting the anchor bolts as required. The superstructure will then be helicoptered out in one piece to a designated heliport. 2) Disposal of the existing trail bridge superstructure. The superstructure becomes the property of the Contractor and is to be removed from Government property and properly disposed of. The existing bridge plans state un-welded edges of gusset plates were to be treated with red lead primer and painted. Prior to disposal or other activities that might create dust or paint chips at the un-welded edges of the gusset plates the Contractor will have the surfaces tested for the presence of lead. It is anticipated the testing will be performed after the superstructure has been transported to the heliport. If lead is present and will increase the Contractor's disposal cost's additional compensation maybe requested. 3) Supply of a prefabricated steel trail bridge. The Contractor shall supply and install a steel truss configuration trail bridge in accordance with the specifications and plans. The steel trail bridge to be designed and fabricated by an established company. Submittals are required to be approved by the C.O. prior to fabrication. The steel bridge will be delivered to the designated heliport, assembled, flown into the bridge site, and placed on prepared substructures. 4) Supply of decay resistant wood bridge deck planks. 5) Supply of concrete sill substructures. The Contractor shall supply and install concrete substructures (sills) in accordance with the specifications and plans. 6) *ALL MECHANIZED NOISE GENERATING (HELICOPTER FLIGHTS AND POWERED HAND TOOL USE) WORK AT THE BRIDGE SITE WILL BE COMPLETED BETWEEN OCTOBER 1, 2018 - November 30, 2018. FROM MARCH 1 - OCTOBER 1 AN OWL CLOSURE IS IN EFFECT AND NO OPERATIONS THAT GENERATE LOUD NOISE WILL BE PERFORMED AT THE SITE. 7) Minor bridge approach work. The new bridge deck elevation will be slightly higher than the existing bridge deck elevation and require construction of bridge approaches from materials on site. THE SOLICITATION FOR THIS PROJECT WILL BE POSTED ON FBO ON OR AROUND FEBRUARY 28, 2018
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/467/12-046W-18-R-0003/listing.html)
 
Place of Performance
Address: bridge is located in the Columbia River Gorge National Scenic Area: on trail #441 at M.P. 1.9 (45.57139167, -122.10596944)., United States
 
Record
SN04819386-W 20180214/180212231015-4744b979a1fce85ae96fe03a586f3acf (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.