MODIFICATION
34 -- CEN Trunnion Seal & Pin Replacement - Amendment 2 - Amendment 1
- Notice Date
- 2/27/2018
- Notice Type
- Modification/Amendment
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- Department of the Army, U.S. Army Corps of Engineers, USACE District, Nashville, Attn: CELRN-CT, PO Box 1070, Nashville, Tennessee, 37202-1070, United States
- ZIP Code
- 37202-1070
- Solicitation Number
- W912P5-18-S-0002
- Point of Contact
- FannieM. Robertson, Phone: 6157367986
- E-Mail Address
-
Fannie.M.Robertson@usace.army.mil
(Fannie.M.Robertson@usace.army.mil)
- Small Business Set-Aside
- N/A
- Description
- Statement of Work Specification CENTER HILL TRUNNION PIN AND RUBBER J-SEAL REPLACEMENT SOURCES SOUGHT NOTICE The Government is issuing this Sources Sought Notice to determine a competitive basis. This is not a solicitation. No reimbursement will be made for any costs associated with providing information in response to this survey. This questionnaire is for market research purposes only. Only contractors capable of performing this type of work should respond to this notice. Requirement The U.S. Army Corps of Engineers (USACE), Nashville District, anticipates soliciting a requirement for a firm fixed price construction contract to remove the existing trunnion pin in accordance with contract plans and specifications. Bore the existing trunnion bronze bushing and fabricate a new trunnion pin to fit with the boring bushing in accordance with the contract plans and specification. Install new pin in accordance with contract plans and specifications. Provide spillway gate bracing for pin removal and pin installation. Replace J-seals and J-seal hardware for gates 1 to 8 in accordance with contract plans and specifications. Remove and dispose lead paint from the J-seal mounting bars and angles in accordance with contract plans and specifications. Paint existing J-seal mounting bars and angles in accordance with contract plans and specifications. The Contractor shall provide the necessary plant, labor, materials, equipment, and transportation for a complete design and satisfactory installation of the required metal ladder and ladder assembly including cages, platforms and personal fall arrest system as specified herein and as shown in the drawings on nine spillway gate piers. The ladder shall be installed on the downstream side of the pier. Also cutting existing concrete parapet wall to get access to the ladder. Base contract shall cover the trunnion pin replacement for gate No. 7. J-seals replacement shall be covered under options 1 to 8. Access ladders shall be covered under options 9 to 17. The estimated magnitude of this project is between $500,000 and $3,000,000. The types of work and skill sets for this requirement are as follows: a) Demolition and debris and rubbish removal (rubber seals); b) Procurement and installation of rubber J-seals. c) Metal fabrications. e) Procurement, fabrication and installation of new pin in accordance with ASTM International. f) Lead paint removal. F) Vinyl painting. The anticipated NAICS code is 237990, Other Heavy and Civil Engineering Construction, with a small business size standard of $36.5 million. Survey The Government is issuing this notice to determine a competitive basis. This is not a solicitation and the items listed herein are subject to change or eliminated from the requirement. This questionnaire is for market research purposes only. Only contractors capable of performing this type of work should respond to this notice. Your response to this survey is requested by Tuesday, April 10, 2018 at 10:00 a.m. Central Standard Time (CST). All information MUST be submitted by e-mail to Contract Specialist Fannie Robertson at Fannie.M.Robertson@usace.army.mil or by fax to 615-736-7124. 1. Name of your firm: 2. CAGE: 3. Point of Contact, Phone number and EMAIL address: 4. Please list no more than three (3) projects which include the above referenced type of work. If possible, provide projects that cover the most skill sets listed above. Examples must be from projects in which your firm was the prime, or sub-contractor, and in which your firm performed at least 50% of the construction work. Examples must have been completed within the last eight (8) years. a. Project Name: Contract Number (if applicable): Year Completed: Prime Contractor or Sub-Contractor: Type and percentage of work self-performed (based on contract value): Dollar Amount: Cable Voltage: General Description of project: b. Project Name: Contract Number (if applicable): Year Completed: Prime Contractor or Sub-Contractor: Type and percentage of work self-performed (based on contract value): Dollar Amount: Cable Voltage: General Description of project: c. Project Name: Contract Number (if applicable): Year Completed: Prime Contractor or Sub-Contractor: Type and percentage of work self-performed (based on contract value): Dollar Amount: Cable Voltage: General Description of project: 5. Are you a Small Business classified under the above NAICS code? If so, do you fall into a sub-category (e.g. HubZone, 8(a), SDVOSB, WOSB, etc.)? 6. If your company is a small business concern, per FAR 52.219-14, at least 25 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern. Can your firm be expected to do this, given your current employee situation? (Please respond yes or no.) 7. Does your company have experience in the last 10 years with providing pre-construction, during construction, and post-construction submittals as a prime contractor on USACE construction contracts similar to this requirement in scope and magnitude? 8- Has your company, in the last 10 years, self-performed in-place machining work on any tainter gate components? In-place work is defined as work performed and completed without removing the gate from its installed location. 9- Does your company have experience in the last 10 years with self-performing in-place construction work on high-head dam spillways utilizing scaffolding or temporary catwalks? 10- Has your company, in the last 10 years, self-performed in-place work on any tainter gates, such as cleaning, painting, machining of gate mechanics, replacement of pins, seals or other components, etc.? In-place work is defined as work performed and completed without removing the gate from its installed location. 7. If this requirement is advertised, do you anticipate submitting a proposal? 11. Please provide any additional information you feel is necessary. cope of Work 1 SCOPE 1.1 Trunnion Pin Replacement Center Hill Spillway (Tainter) Gate No. 7: Remove the existing trunnion pin in accordance with contract plans and specifications. Bore the existing trunnion bronze bushing and fabricate a new trunnion pin to fit with the boring bushing in accordance with the contract plans and specification. Install new pin in accordance with contract plans and specifications. Provide spillway gate bracing for pin removal and pin installation. Center Hill Dam is located on Cumberland River in Dekalb County, TN. 1.2 J-seals Replacement Center Hill Spillway gates 1 to 8: Replace J-seals and J-seal hardware for gates 1 to 8 in accordance with contract plans and specifications. Remove and dispose lead paint from the J-seal mounting bars and angles in accordance with contract plans and specifications. Paint existing J-seal mounting bars and angles in accordance with contract plans and specifications. Center Hill Dam is located on Cumberland River in Dekalb County, TN. 1.3 Trunnion Pin Access Ladders The Contractor shall provide the necessary plant, labor, materials, equipment, and transportation for a complete design and satisfactory installation of the required metal ladder and ladder assembly including cages, platforms and personal fall arrest system as specified herein and as shown in the drawings on nine spillway gate piers. The ladder shall be installed on the downstream side of the pier. Also cutting existing concrete parapet wall to get access to the ladder. 2 BASE CONTRACT Base contract shall cover the trunnion pin replacement for gate No. 7. 3 OPTIONS 3.1 J-seals Replacements. J-seals replacement shall be covered under options 1 to 8. 3.2 Access Ladders Access ladders shall be covered under options 9 to 17.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA62/W912P5-18-S-0002/listing.html)
- Place of Performance
- Address: Center Hill Dam, 310 Lancaster Road, Lancaster, Tennessee, 38569, United States
- Zip Code: 38569
- Zip Code: 38569
- Record
- SN04836138-W 20180301/180227231309-dc2956c028f398aa7882edfe4279acae (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |