P -- Demolish Indoor Pool B#209, Osan AB (MATOC ONLY) - SF1442

Notice Date
6/12/2018
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
238910 — Site Preparation Contractors
 
Contracting Office
Department of the Army, Army Contracting Command, CSBs, 411TH CSB (W90VN6) RCO OSAN, Unit #15289, APO, Non-U.S., 96205-5289, Korea, South
 
ZIP Code
00000
 
Solicitation Number
W90VN618R0012
 
Archive Date
7/17/2018
 
Point of Contact
Chaeyong Yi, Phone: 3157848977
 
E-Mail Address
chaeyong.yi5.ln@mail.mil
(chaeyong.yi5.ln@mail.mil)
 
Small Business Set-Aside
N/A
 
Description
Submittal Register Drawings 2. PRINCIPLE FEATURES: This project includes the following principle features: 2.1 B209 2.1.1 Install and remove temporary safety 2.4M (Meter) fence with anti-rust net around B209. 2.1.2 Demolish and dispose of superstructure and substructure of foundation, floor, wall, and roof including interior wall, door, window, louver, all interior material, and all equipment. 2.1.3 Demolish and dispose of concrete side walk, screen wall, bicycle rack, trash enclosure, ramp, handrail including foundation. 2.1.4 Demolish and dispose of retaining wall and steel grating. 2.1.5 Install new retaining wall and stair with fence and handrail as shown on the drawing A-04 and A-05. 2.1.6 Install new sidewalk as shown on the drawing A-04. 2.1.7 Install new place-in-concrete ditch with steel grating as shown on the drawing A-05. 2.1.8 Remove 12,000Gal fuel tank with piping, dike and concrete pad including cleaning. 2.1.9 Remove underground water and sewer lines including block-up lines with capping and concrete thrust block. 2.1.10 Remove HVAC unit including chiller, piping and concrete pad. 2.1.11 Remove electric transformer, pole, lines, conduit and concrete pad including electrical termination. 2.1.12 Install new solid sodding on all demolished area including backfilling and positive drain with finish leveling as shown on the drawing A-04. 2.1.13 Remove all elec item as shown on the drawing E-02. 2.1.14 Remove X marked elec item at the site. 2.1.15 Terminate comm cables in comm manhole as shown on the drawing E-03. 2.1.16 Install new conduits, wires, panelboard, lighting contactor, and area lighting fixtures as shown on the drawing E-04, E-05 and E-06. 2.2 PLAYGROUND AND SOCCER FILED 2.2.1 Remain and protect existing playground and soccer field area. 2.3 RESTROOM FACILITY AND CONNEX IN THE CONTRACTOR'S VILLAGE 2.3.1 Demolish and dispose of superstructure and substructure of foundation, floor, wall, and roof including connex and concrete masonry unit facilities. 2.3.2 Demolish and dispose of concrete side walk including pavement tiles on the floor. 2.3.3 Demolish and dispose of fence including foundations. 2.3.4 Remove septic manhole and movable toilet tanks including cleaning. 2.3.5 Remove vinyl covering on the stairway. 2.3.6 Remove underground water and sewer lines including block-up lines with capping and concrete thrust block. 2.3.7 Remove electric lines and conduit including electrical termination. 2.3.8 Install new solid sodding on all demolished area including backfilling and positive drain. 2.4 Demolition and Deconstruction The contractor shall follow OMA Specification 02 41 00 Demolition and Deconstruction.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/b5ba270ef2cc41649dea81f28a9bc027)
 
Place of Performance
Address: Osan AB, Korea, South
 
Record
SN04952822-W 20180614/180612230852-b5ba270ef2cc41649dea81f28a9bc027 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.