Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JUNE 20, 2018 FBO #6053
SOLICITATION NOTICE

28 -- LMA ISO-Phased Bus System Inspection & Testing

Notice Date
6/18/2018
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Walla Walla, Attn: CENWW-CT, 201 North 3rd Avenue, Walla Walla, Washington, 99362-1876, United States
 
ZIP Code
99362-1876
 
Solicitation Number
W912EF18Q0103
 
Point of Contact
LeAnne R. Walling, Phone: 5095277230
 
E-Mail Address
leanne.r.walling@usace.army.mil
(leanne.r.walling@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Description
Summary of Scope of Work: The Iso-Phase bus and enclosure systems shall receive a full assessment and a set of routine tests, defined in IEEE C37.23, as practical and applicable. The test requirement constitute a minimum and do not preclude the contractor from performing other standard tests. The non-continuous enclosure system is experiencing, in the area of the 1979 modification, a section of high heat and circulating currents on the bus enclosure and on adjacent bus supports. This section shall be thoroughly inspected and corrective actions defined. Electrical Scope of Work: Inspections A. The iso-phase bus and enclosure assessment shall be an inspection of both bus types from the generators to a demarcation point, below the weather exposed bus enclosures, that shall in-clude: a. All taped and/or gasketed covers, hatches, joints and sections. b. All standoff and through bushings. c. All connecting hardware and support structures. d. All bus enclosure bonding and grounding connections. e. All phase bus connections (welded and bolted). f. The iso-phase bus. g. The iso-phase enclosures h. Deviations from original designs i. The 1979 phase rotation bus modification Methods used to identify the condition assessment shall include but, are not limited to: a. Bore scoping of bus and enclosure. b. Visual inspection. c. High potential testing of bus. d. Documenting all areas needing corrective action shall be submitted in writing and documented on as-built iso-phase system project drawings. e. Contractor shall submit a list of all hardware and corrective actions required to restore bus and enclosure to optimal design function, per IEEE C37.23, Standard for Metal-Enclosed Bus. f. Submission of a complete final report, post inspection, shall include overall system condition assessment and inspection results, with recommended corrective actions.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA68/W912EF18Q0103/listing.html)
 
Place of Performance
Address: Lower Monumental Dam, 5520 Devils Canyon Rd, Kahlotus, Washington, 99335, United States
Zip Code: 99335
 
Record
SN04957871-W 20180620/180618230605-a512863c0f69cc95b48432adf01858bf (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.