Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JUNE 21, 2018 FBO #6054
MODIFICATION

Y -- Space Battalion Readiness Center

Notice Date
6/19/2018
 
Notice Type
Modification/Amendment
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of the Army, National Guard Bureau, USPFO for Colorado, Attn: Mail Stop 53, 660 South Aspen Street, Building 1005, Aurora, Colorado, 80011-9511
 
ZIP Code
80011-9511
 
Solicitation Number
W912LC-18-B-0001
 
Point of Contact
Whitney L Arkle, Phone: 7202504031, Sabrina M. DeRamus, Phone: 720-250-4032
 
E-Mail Address
whitney.l.arkle.mil@mail.mil, sabrina.m.deramus.civ@mail.mil
(whitney.l.arkle.mil@mail.mil, sabrina.m.deramus.civ@mail.mil)
 
Small Business Set-Aside
Total Small Business
 
Description
The USPFO for Colorado intends to issue an Invitation for Bid to award a single firm fixed-price construction contract for the Space Battalion Readiness Center (SP BN RC) located on Fort Carson, Colorado. The project includes the construction of an approximately 37,900 square foot building, steel frame with metal stud walls, exterior metal panels, standing seam and flat roofs, storefront and windows, site work, associated utility work, sediment and erosion control, and stormwater management. The project will include emergency power generator backup for the facility; geothermal mechanical system, and LED lighting, and automated HVAC controls. The building will be constructed to obtain LEED certified Silver Rating in accordance with USGBC LEED certification. Construction will be located on a 15-acre Site near Barger Road and Barkeley Avenue at Ft. Carson, Colorado Springs, Colorado. Optional items of the contract will include: 6580 SF West End of the Facility; 3096 SF Unheated Storage Building; Concrete Pavers on Satellite Patio; Three interior overhead doors at Assembly Hall; Operable partition, cabinets, and countertops in Classrooms; Additional 2" asphalt surface course on POV lot; Landscaping; Front entry patio, Wall and Sign; MDF wainscoting wall panels; and Two high volume, low-speed ventilation fans in entry hall. The contract duration is 540 days after Notice to Proceed (NTP). This project is set aside 100% for Small Business. The magnitude is between $10,000,000 and $25,000,000. Sole Source items include: Andover Continuum/SmartStruxture HVAC Controls. The Schneider Electric SmartStruxure and Andover Continuum Energy Management Control System (EMCS)/Building Control System -Westover. CoreMax. Hardware lock cores CommScope (Formerly TE Connectivity). American Power Conversion (APC-UPS). Your attention is directed to FAR CLAUSE 52.219-14 (b) (4) LIMITATIONS ON SUBCONTRACTING which states "By submission of an offer and execution of a contract, the Offeror/Contractor agrees that in performance of the contract the concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees" applies to this project. The tentative date for issuing the solicitation is 22 June 2018. Construction is anticipated to be initiated in the fall 2018 Interested offerors must be registered in SAM. To register go to: https://www.sam.gov/portal/public/SAM/. You will need your DUNS number register. Instructions for registering are on the web page. The solicitation and associated information and the plans and specifications will be available only from the Federal Business Opportunities (FedBizOpps) website online at https://www.fbo.gov/. FedBizOpps is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders/offerors must register with FedBizOpps before accessing the system. (Please note the registration for access to the secure site takes approximately 15 business days. PLAN ACCORDINGLY! Plans and Specifications will be available as a "secure package". Interested vendors MUST have Export Controlled Authorization AND an MPIN in order to review the plans and specifications. Contractors who do not already have a MPIN are advised that the normal processing is 7 to 12 business days to obtain a MPIN password that will give them access to the plans and specifications, which are located in the controlled access location on FBO. Reference paragraph 4.7 of the Vendor Guide for instructions to obtain a MPIN to retrieve the specification and drawing documents. See video in vendor guide at 3.3 on advanced functions for other information. Bidders/offerors who have registered with FedBizOpps must access the data for this solicitation with their MPIN. Bidders/offerors cannot log into the FedBizOpps home page and search for data.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/NGB/DAHA05/W912LC-18-B-0001/listing.html)
 
Place of Performance
Address: Fort Carson, Colorado, 80913, United States
Zip Code: 80913
 
Record
SN04960080-W 20180621/180619230719-3c6fc4f062ea2be0f07f54a50985a0fb (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.