SOLICITATION NOTICE
y -- AULT STAGE 08 CONSTRUCTION PROJECT
- Notice Date
- 6/20/2018
- Notice Type
- Presolicitation
- NAICS
- 237130
— Power and Communication Line and Related Structures Construction
- Contracting Office
- WAPA (RMR) US DOE/WESTERN AREA POWER ROCKY MOUNTAIN REGIONAL OFFICE 5555 E. CROSSROADS BLVD LOVELAND CO 80539-8986 US
- ZIP Code
- 00000
- Solicitation Number
- 89503218BWA000007
- Point of Contact
- Ray, Eileen R
- Small Business Set-Aside
- Total Small Business
- Description
- NOTE: All responses to this IFB shall be mailed to Western Area Power Administration, Rocky Mountain Region, P.O. Box 3700, Loveland, CO 80539-3003, ATTN: Eileen Ray. Physical Address for hand carried quotes/proposals/bids: Western Area Power Administration, Rocky Mountain Region, 5555 East Crossroads Boulevard, Loveland CO, 80538. The Western Area Power Administration, Rocky Mountain Region has a requirement for a contractor to provide all the labor, materials, tools, equipment, transportation, and other resources necessary to complete this project. The principal components of work includes; Remove and replace three (3) 167 MVA 345/230-kV power transformers designated KU1A-1, KU1A-2, and KU1A-3, foundations, conduit, conductors and cables for delivery of new three-phase 600 MVA transformer designated KU1A (GFE). Remove and replace seven (7) oil 230-kV power circuit breakers (GFE) designated JV2A, JV4A, JV5A, JV5B, JV6A, JV7B, and JV10A. Furnish one (1) 500-kV (operated at 345-kV) to replace one (1) 345-kV motor operated disconnect switch and one (1) 230-kV motor operated disconnect switches (MODs) designated WU1A and WV1A. Remove and replace two (2) 13.8-kV oil reactors designated KW1F and KW1G with two (2) air core reactor units (GFE) and 13.8-kV oil breakers JW1C and JW1D with vacuum breakers (GFE). Furnish and install 13.8-kV disconnect switches WW1C and WW1D, 13.8-kV voltage bus, grounding system, conduit, and insulated conductors and cables. Remove and replace ground fault detection circuits on the KU1A and KU1B transformer tertiaries. Remove and replace fused disconnect switch FW1A with fused interrupting switch WW1E FW1A. Remove and discard 345-kV series capacitor bank, associated steel, foundations, and equipment house. Add steel support to power distribution center DWC. Furnish and install new steel structures and concrete foundations; furnish and install adapter plates for equipment mounting on existing structures; furnish and install new structures on existing foundations; modify existing foundations; and paint structural steel. Replace control building roof: Remove the existing flat butyl membrane roof system down to the concrete roof deck. Provide and install new membrane roof system and flashing on control building. All work shall be completed 600 calendar days after the date of receipt of Notice to Proceed. The estimated order of magnitude is between $1,000,000.00 “ 5,000,000.00. FAR Part 14, Sealed Bidding is being utilized for this requirement. The solicitation will be issued as a 100% small business set-aside. The applicable NAICS Code is 237130; Size Standard is $36.5M. The solicitation including specifications and drawings will be issued electronically at this site on or about 05 July 2018 at the following sites: https://www.fbo.gov and https://www.fedconnect.net. NOTE: the Buy American Act applies to the solicitation. Refer to FAR Clause 52.225-9 (Section I) and FAR Provision 52.225-10 (Section L) if any non-domestic material will be proposed. Bidders must identify any non-domestic materials (not manufactured in United States) included in their bid. Please check with your suppliers and subcontractors to verify whether or not their quotes include non-domestic material.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOE/PAM/HQ/89503218BWA000007/listing.html)
- Record
- SN04960970-W 20180622/180620230719-76294120c71536ba53d0fa0c643db9f6 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |