Z -- Repair MFH Parking Garage B#1016, Osan AB (MATOC WORK PLAN) - SF1442

Notice Date
6/20/2018
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of the Army, Army Contracting Command, CSBs, 411TH CSB (W90VN6) RCO OSAN, Unit #15289, APO, Non-U.S., 96205-5289, Korea, South
 
ZIP Code
00000
 
Solicitation Number
W90VN618R0028
 
Archive Date
8/11/2018
 
Point of Contact
Chaeyong Yi, Phone: 3157848977
 
E-Mail Address
chaeyong.yi5.ln@mail.mil
(chaeyong.yi5.ln@mail.mil)
 
Small Business Set-Aside
N/A
 
Description
Submittal Register Drawings Solicitation 2. PRINCIPLE FEATURES: This project includes the following principle features: 2.1 Civil Works 2.1.1 Replace Sidewalk 2.1.1.1 Remove existing sidewalk and stair around B1016. 2.1.1.2 Install new concrete sidewalk including soil back fill, expansion joint, and contraction joint. 2.1.1.3 Install new stair including soil back fill, subbase course, base course and foundation. 2.1.1.4 Install new hand railing including concrete foundation. 2.1.2 Repair Sloped Hill 2.1.2.1 Remove existing top soil on the hill 2.1.2.2 Remove erosion soil in the concrete ditch and on the 1st floor. 2.1.2.3 Repair existing concrete ditch. 2.1.2.4 Install new protected block including back fill, top soil, and anchor rod. 2.1.2.5 Install new solid sodding including back fill, fertilizing, top soil and positive drain. 2.2 Architectural Works 2.2.1 Repaint Stair and 4th floor inside wall 2.2.1.1 Remove whole coating as surface preparation on existing 4th floor wall, retaining wall, stair wall, stair ceiling, hand rail, hand rail, and canopy. 2.2.1.2 Repair crack on the concrete wall on the stair. 2.2.1.3 Apply one coat of primer (MPI-4) and two coats of latex (MPI-11) on the concrete wall and ceiling. 2.2.1.4 Apply one coat of primer (MPI-79) and two coats of alkyd (MPI-94) for steel handrail, guard rail, and decorative grille. 2.2.1.5 Prior to surface preparation and coating applications, remove, mask or otherwise protect hardware, hardware accessories, machined surfaces, radiator covers, plates, lighting fixtures, public and private property, and other such items not to be coated that area in contact with surfaces to be coated. 2.2.1.6 Replace copper plant and copper grille next to stair. 2.2.2 Recoat Floor and Line Marking 2.2.2.1 Remove and reinstall bicycle rack and parking stop on the floor. 2.2.2.2 Remove floor coating entirely and line marking including stair floor. Metal shot blasting removal is not allowed on Osan AB. 2.2.2.3 Install new vehicular deck four coating systems of elastomeric traffic bearing membrane, Vulkem #171(primer), #350NF(base coat, Min: 0.64MM(Millimeter), #346 (intermediate coat, Min:0.384MM), and #346 (top coat, Min:0.308MM) with silica sand by Tremco or approved equal including stair floor. 2.2.2.4 Install new line marking including letter, stripe, direction arrow, and room identification. 2.2.2.5 Install new self-leveling resin mortar including positive drain and waterproofing on the 4th floor. 2.2.2.6 Repair expansion joint, spall, crack, and damaged area. 2.2.3 Repair Drainage System on 3rd floor ceiling and 4th floor 2.2.3.1. Install new hole on the 4th floor. 2.2.3.2. Connect drain on the 3rd floor and install new drain line. 2.2.4 Replace down spout 2.2.4.1. Remove down spout. 2.2.4.2. Install new down spout next to the stair. 2.3 Electrical Works 2.3.1. Removal Light 2.3.1.1. Remove X marked parking lot lighting fixtures as shown drawing. 2.3.1.2. Remove X marked vapor proof lighting fixtures as shown drawing. 2.3.1.3. Remove X marked pole mounted lighting fixtures as shown drawing. 2.3.1.4. Remove X marked EXIT lighting fixtures as shown drawing. 2.3.1.5. Remove malfunction lighting contactors in the lighting contactor cabinets. 2.3.1.6. Remove X marked WP(Weather-Proof) GFCI(Ground-Fault-Circuit-Interrupter) covers. 2.3.1.7. Remain existing conduits, wires, and boxes. 2.3.2. Install Light 2.3.2.1 Install new LED parking lot lighting fixtures as shown drawing. New LED parking lot lighting fixtures shall be LED type and it shall include motion sensor, dimming with no activity and emergency battery pack. 2.3.2.2 Install new LED vapor proof lighting fixtures as shown drawing. 2.3.2.3 Install new LED pole mounted lighting fixtures with photo cell as shown drawing. 2.3.2.4 Install new WP EXIT light fixtures as shown drawing. 2.3.2.5 Install new lighting contactors in the lighting contactor cabinets. Contractor shall make the lighting contactor operable after replacing lighting contactors. Install new WP GFCI covers.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/2d33cc4cd1a4f3bd56817106722857fe)
 
Place of Performance
Address: Osan Air Base, Korea, South
 
Record
SN04962518-W 20180622/180620231306-2d33cc4cd1a4f3bd56817106722857fe (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.