Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JUNE 23, 2018 FBO #6056
MODIFICATION

Y -- Design-Build Channel Maintenance at two Arroyos - Solicitation 1

Notice Date
6/21/2018
 
Notice Type
Modification/Amendment
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
International Boundary and Water Commission, Acquisition Division, Acquisition Division, 4171 North Mesa, Suite C-100, El Paso, Texas, 79902, United States
 
ZIP Code
79902
 
Solicitation Number
191BWC18R0007
 
Response Due
7/23/2018 4:00:00 PM
 
Point of Contact
Lanisa M. McCollum, Phone: 9158324120
 
E-Mail Address
lanisa.mccollum@ibwc.gov
(lanisa.mccollum@ibwc.gov)
 
Small Business Set-Aside
N/A
 
Description
Evaluation Factors for Award Channel Maintenance Structures at Two Arroyos NM180014 01052018 NM14 191BWC18R0007 Client Authorization Letter 191BWC18R0007 Past Performance Questionnaire IBWC Form 117 IBWC Form 116 IBWC Form 110 Sieve 15-085 Sieve 15-084 Sieve 15-083 Sieve 15-082 Sieve 15-081 Sediment_Data Field_Assessment_Photos 4-141009_RGCP_CMA SOW Soilcitiation 191BWC18R0007 This is Only a Presolicitation Notice. A forthcoming solicitation will include information on how to obtain all relevant documentation. All responsible sources may submit a proposal to be considered by the Agency when the solicitation is posted. This is NOT a request for proposal. Please do not submit a proposal in response to this Presolicitation Notice. General Project Information Design and construct channel maintenance structure at two (2) arroyo locations and channel excavation within the Rio Grande Canalization Project (RGCP) in Dona Ana County, New Mexico. The work requires design and construction of an excavated channel to remove localized sediment and vegetated islands within the main Rio Grande from the Rincon to Bignell Arroyos. At the Rincon and Reed Arroyos, the work requires evaluation of alternatives, design, and construction of channel maintenance structures to reduce sediment inflow to the RGCP. Major tasks for the Phase I - Design of the project: <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l1 level6 lfo2; tab-stops: 22.5pt;"> 1. Site investigation <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l1 level6 lfo2; tab-stops: 22.5pt;"> 2. Site surveying <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l1 level6 lfo2; tab-stops: 22.5pt;"> 3. Any required geotechnical investigations, modeling, or testing. <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l1 level6 lfo2; tab-stops: 22.5pt;"> 4. Production of construction documents (drawings and technical specifications) <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l1 level6 lfo2; tab-stops: 22.5pt;"> 5. Production of all project reports <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l1 level6 lfo2; tab-stops: 22.5pt;"> 6. HEC-RAS 2D/FLO-2D/HEC-RAS Modeling <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l1 level6 lfo2; tab-stops: 22.5pt;"> 7. Coordination with stakeholders <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-indent: -27.0pt; mso-list: l1 level6 lfo2; tab-stops: 22.5pt;"> 8. Coordination with USIBWC Major tasks for the Phase II - Construction of the project: <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l2 level1 lfo3; tab-stops:.5in;"> 1. Site preparation <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l2 level1 lfo3; tab-stops:.5in;"> 2. Construction of channel maintenance structures at arroyos <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l2 level1 lfo3; tab-stops:.5in;"> 3. Excavation of the channel for removal sediment and vegetated islands <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l2 level1 lfo3; tab-stops:.5in;"> 4. Build access roads needed for routine maintenance <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l2 level1 lfo3; tab-stops:.5in;"> 5. Disposal of sediment, debris, and construction waste from jobsite <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l2 level1 lfo3; tab-stops:.5in;"> 6. Final site surveying The Design‑Builder shall be responsible for complying with all applicable regulations, laws, or permitting authorities pertaining to construction of this project. This work is located in Dona Ana County, New Mexico. A site visit will be listed in the solicitation. Magnitude The magnitude of the project is between $5,000,000 and $10,000,000. Other Information The solicitation, plans, and specifications are expected to be posted on or about June 18, 2018 (this is a target date which may slip or change; if the solicitation is not posted on Federal Business Opportunities by June 18, 2018 that is because the solicitation is not available for posting). The solicitation will be available for a minimum of thirty (30) calendar days. Award is expected to be made on or before September 30, 2018. This is a Presolicitation Notice. The solicitation will include information on how to obtain the relevant documentation. There is no charge for the solicitation documents. All responsible sources may submit a proposal to be considered by the Agency. This requirement shall be solicited using Two-Phase Design-Build Selection Procedures in accordance with Federal Acquisition Regulation (FAR) SUBPART 36.3. THIS IS THE SOLICITATION NOTICE. THE USIBWC IS REQUESTING PROPOSALS AT THIS TIME. Please refer to the solicitation package.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/IBWC/IMD/ElPasoTX/191BWC18R0007/listing.html)
 
Place of Performance
Address: Rincon to Bignell Arroyos, New Mexico, United States
 
Record
SN04963422-W 20180623/180621231123-100a36489730a660f30539dc0cf1d6ea (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.