AWARD
Z -- Bldg 769 Room 195 EMPRS Server Room
- Notice Date
- 6/21/2018
- Notice Type
- Award Notice
- NAICS
- 238210
— Electrical Contractors and Other Wiring Installation Contractors
- Contracting Office
- N69450 NAVFAC Southeast, PWD Mid-South 5722 Integrity Drive Building 455 Millington, TN
- ZIP Code
- 00000
- Solicitation Number
- N6945018T8012
- Archive Date
- 7/20/2018
- Point of Contact
- Michael Terrell
- E-Mail Address
-
4-5490
- Small Business Set-Aside
- Partial Small Business
- Award Number
- N6945018P8012
- Award Date
- 6/20/2018
- Awardee
- Cherokee Nation Enviromental Solutions (DUNS 078312077)<br />
- Award Amount
- 133,408.74
- Line Number
- 0001
- Description
- CLIN 0001 Building 769, Room 195 Special Processing Node: labor, equipment, and material and incidental related work for the installation of electrical according drawings T-100, E-100, E-101, E-102, E-103, AND E-104 and per the specifications in this contract. The work to be completed is for Room-195 server room located in Bldg-769. 769 SELECTION BOARD, TANK #3 Relocate 2 each circuits off of panel UPS-1 that feed a copier/scanner and a refrigerator to Panel-LBA and reroute 1-each receptacle in Southeast Corner of Tank-3. a.Provide necessary circuit locating equipment for proper verification for the relocation of the circuits listed. b.Relocate circuits for the copier/scanner and refrigerator circuit in area-148 from Panel UPS-1 and move them to Panel LBA breakers 38 and 40. Panel LBA is in the same room just a few feet away. c.Provide all necessary labor and material to relocate the 2-each 20-amp single phase circuits from ups-1 to LBA in same room. d.Provide necessary labor and material to separate and reroute receptacle circuit in Tank 3 at the Southeast corner of the room indicated by on the attached drawing. This rerouted circuit shall be connected to UPS-1. e.This receptacle shall be separated from the circuit that is currently located in area-148 which can be either the copier/scanner or the refrigerator listed above. Use locating equipment to verify. f.Provide corrected schedules in the UPS-1 panel board and Panel LBA. CLIN 0002 Building 769, Room 195 EMPRS Security Fence: Construct a new painted gypsum board partition and install a new welded wire security cage sectioning off the server area from the office areas. General scope items include the following: a.The painted gypsum board wall will feature sound absorbent panels and will be mechanically anchored to the raised access floor. It will extend up to the existing lay-in ceiling and be braced to the structure above. b.The welded wire partition will be factory finished and will extend from its anchoring points in the raised access floor to a level of nine feet above the raised floor. It will feature a five-foot-wide by eight-foot-tall sliding door with cipher lock. The corner posts as well as the posts on either side of the sliding door will be braced the structure above. c.To accommodate the wall construction, the existing sheet metal ductwork for the Liebert unit will have to be modified to relocate two of the supply air diffusers to the server area on the room including capping off the main supply duct and adding new sheet metal ducts for the new locations of the supply air diffusers. d.There will be convenience outlets added to the gypsum board wall as well as the addition and replacement of the emergency cut-off switches for the server area. Lighting, smoke and temperature rise sensors will need to be relocated in the area of the wall as well.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DON/NAVFAC/N40083A/Awards/N6945018P8012.html)
- Record
- SN04964087-W 20180623/180621231354-6b19aee32e4a8ff2853da6bcd08939eb (fbodaily.com)