Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JUNE 27, 2018 FBO #6060
SOLICITATION NOTICE

Y -- Replace Air Cooler and Chiller - FA3016-18-R-0060 Request for Proposals - Statement of Work

Notice Date
6/25/2018
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
Department of the Air Force, Air Education and Training Command, 502d Contracting Squadron, 1655 Selfridge Avenue, JBSA Lackland, Texas, 78236-5253, United States
 
ZIP Code
78236-5253
 
Solicitation Number
FA3016-18-R-0060
 
Point of Contact
Ryan J. Sutton, Phone: 2106716412, Ruben Gonzales, Phone: 2106718071
 
E-Mail Address
ryan.sutton@us.af.mil, ruben.gonzales.4@us.af.mil
(ryan.sutton@us.af.mil, ruben.gonzales.4@us.af.mil)
 
Small Business Set-Aside
Woman Owned Small Business
 
Description
Statement of Work Request for Proposals FA3016-18-R-0060 The project consists of providing a complete design and construction for the replacement of a 134.4 Ton chiller and chilled water pump. The chiller is a backup chiller and currently inoperable. The intent of this project is to maintain original design parameters at the three existing air handlers that serve the chiller. The work includes removal and replacement of the existing 134.4 ton air cooled chiller and chilled water pump for Room 219 at B2000. The contractor shall remove and replace all chiller piping external to the building, which includes balancing and isolation valves, chiller connections, thermometers, pressure gauges, insulation with metallic jacketing, and all other components necessary to provide a complete functioning chilled water piping system between the exterior wall of the building and the new chiller. Replace all existing electrical branch circuits, switches, and controls to fit the new chiller and the new chilled water pump as required The existing concrete pad shall be modified or replaced to fit the new chiller if required. Contractor shall connect the chiller controls to local building EMCS located in the main mechanical room of the building. The location of work will be on Joint Base San Antonio - Lackland AFB, Texas. The 502D Contracting Squadron, Joint Base San Antonio Texas intends to award a contract with a 330 cumulative day period of performance. The estimated magnitude of the entire contract is between $250,000 and $500,000.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USAF/AETC/LackAFBCS/FA3016-18-R-0060/listing.html)
 
Place of Performance
Address: Joint Base San Antonio - Lackland, San Antonio, Texas, 78236, United States
Zip Code: 78236
 
Record
SN04967154-W 20180627/180625230833-48f221fdd591c0835337979ff470a455 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.