SOLICITATION NOTICE
Y -- Chatt-Oconee ERFO Reconstruction FSR 44, FSR 32C and FSR 70
- Notice Date
- 6/27/2018
- Notice Type
- Presolicitation
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- Department of Agriculture, Forest Service, R-8 Chattahoochee and Oconee National Forests, 1755 Cleveland Highway, Gainesville, Georgia, 30501
- ZIP Code
- 30501
- Solicitation Number
- 12344V18R0002
- Point of Contact
- Leslie L. Solberg, Phone: 503-668-1667
- E-Mail Address
-
lsolberg@fs.fed.us
(lsolberg@fs.fed.us)
- Small Business Set-Aside
- Total Small Business
- Description
- Proposals from certified Small Business Concerns only will be accepted for the Chattahoochee-Oconee National Forests, GA - ERFO construction of FSR 44, FSR 32C, and FSR 70, located in White, Rabun and Towns Counties, Georgia. This project, solicitation and resultant contract will include 2 schedules as follows: SCHEDULE A will consist of FSR 44-MP 2.49 and FSR 44-MP 6.80 and SCHEDULE B will consist of FSR 32C-MP 0.35 and FSR 70-MP 3.30. The intent is to awarrd a single contract that includes both schedules. SCHEDULE A - C.1 DESCRIPTION OF WORK Furnish all labor, equipment, and designated materials, to accomplish the work under this Reconstruction Contract. Reconstruction Work is for the needed repairs and improvements at Designated ERFO Sites on the Chattahoochee Oconee National Forest, as specified by the Schedule of Items. Work is to done on located segments of FS Roads, as Shown on the Project Vicinity Map. Work includes but is not limited to the following major items: o All designated road & drainage excavation areas, embankment reconstruction & repairs, including any specified linear grading road areas by approved contract methods. o Installation of Roadway Blind Drain utilizing specified riprap & geotextile materials. o Installation of new 24-inch galvanized steel culverts for road ditch relief. o Any needed erosion & sediment control measures, clearing & disposal of slash/wood debris from roadway, haul & placement of all riprap rock, haul & placement of all base & surface aggregate courses, seeding of disturbed areas, safety & temporary traffic control measures required for reconstruction operations. C.2 PROJECT LOCATION Within the State of Georgia, the County of White, on the Chattooga River Ranger District of the Chattahoochee-Oconee National Forest, a Total of 2 Project Sites as Located & Shown on the Project Vicinity Map. Directions listed below are to the initial mobilization points for both Project Sites from the City Limits of Gainesville, GA. To FSR 44 Segments 1&2 from Gainesville, GA: Proceed Northwest on US Hwy 129 North approximately 18.80 miles to the Junction with the Appalachian Pkwy/Cleveland Bypass. Merge onto & continue straight on the Appalachian Pkwy/Cleveland Bypass for approximately 3.00 miles to the next Junction with US Hwy 129 North. Turn Left onto US Hwy 129 North & proceed approximately 0.30 mile to the Junction with Albert Reid Road. Turn Right onto Albert Reid Road & proceed approximately 2.00 miles to the Junction with John Head Road. Turn Left onto John Head Road & proceed approximately 0.30 mile to the Junction with GA 75 Alt. South State Hwy. Turn Right onto GA 75 Alt. South State Hwy & proceed approximately 6.60 miles to the Junction with Poplar Stump Road. Turn Left onto Poplar Stump Road & proceed approximately 0.30 mile to the Junction with the Chattahoochee River Road/Myra Branch Road. Merge onto & continue straight on the Chattahoochee River Road/Myra Branch Road for approximately 7.10 miles to the Junction with FSR 44. Proceed onto FSR 44 to both Project Sites at MP 2.49 & MP 6.80. SCHEDULE B - C.1 DESCRIPTION OF WORK Furnish all labor, equipment, and designated materials, to accomplish the work under this Reconstruction Contract. Reconstruction Work is for the needed repairs and improvements at Designated ERFO Sites on the Chattahoochee Oconee National Forest, as specified by the Schedule of Items. Work is to done on located segments of FS Roads, as Shown on the Project Vicinity Map. Work includes but is not limited to the following major items: o All designated road & drainage excavation areas, embankment construction, including any specified linear grading road areas by approved contract methods. o Installation of Roadway Blind Drain utilizing specified riprap & geotextile materials. o Installation of Precast Concrete Jersey Barriers for streambank protection/stabilization. o Any needed erosion & sediment control measures, clearing & disposal of slash/wood debris from roadway, cleaning of road culverts, haul & placement of all riprap rock, haul & placement of all base & surface aggregate courses, seeding of disturbed areas, safety & temporary traffic control measures required for reconstruction operations. C.2 PROJECT LOCATION Within the State of Georgia, Counties of Rabun & Towns, on the Chattooga River Ranger District of the Chattahoochee-Oconee National Forest, a Total of 2 Project Sites as Located & Shown on the Project Vicinity Map. Directions listed below are to the initial mobilization points for both Project Sites from the City Limits of Clayton, GA. To FSR 32C from Clayton, GA: Proceed West on US Hwy. 76 W/E Savannah Street approximately 7.80 miles to the Junction with Persimmon Road. Turn Right onto Persimmon Road & proceed approximately 4.60 miles to the Junction with Coleman River Road. Turn Left onto Coleman River Road & proceed approximately 3.20 miles to the Junction with FSR 32C. Turn Right onto FSR 32C & proceed 0.35 mile to the Project Site. To FSR 70 from Clayton, GA: Proceed West on US Hwy. 76 W/E Savannah Street approximately 7.80 miles to the Junction with Persimmon Road. Turn Right onto Persimmon Road & proceed approximately 4.20 miles to the Junction with Tallulah River Road/FSR 70. Turn Left onto Tallulah River Road/FSR 70 & proceed 3.30 miles to the Project Site. Per FAR 36.204 the magnitude of the entire contract is between $500,000 and $1,000,000 with each FSR range being: FSR 44-MP 2.49 between $100,000 and $150,000 FSR 44-MP 6.80 between $50,000 and $100,000 FSR 32-MP 0.35 between $50,000 and $100,000 FSR 70-MP 3.30 between $250,000 and $300,000 Solicitation documents should be issued on or around July 11, 2018. A bid bond will be required. Annual Representations and Cerfifications FAR 52.204-8 (Jan 2018). The Representations and Cerfifications must be filled in online at http://www.sam.gov/. The required Annual Form Vets-4212 must also be filled in online at http://www.dol/vets4212.htm per FAR 52.222.37. Please send all questions concerning this project to lsolberg@fs.fed.us. Include the solicitation number, project name and number, requesting firm and address, a point of contact and telephone number. IMPORTANT PAYMENT REQUIREMENT In accordance with Federal Acquisition Regulation (FAR) Subpart part 4.1102, prospective contractors shall be resistered in the System for Award Management (SAM) database prior to award of a contract. Also FAR clause 52.232-33 requires SAM registration for payment. SAM registration is available online at the following internet web address: http://www.sam.gov.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USDA/FS/435H/12344V18R0002/listing.html)
- Place of Performance
- Address: Georgia, 30501, United States
- Zip Code: 30501
- Zip Code: 30501
- Record
- SN04970056-W 20180629/180627230702-478ea7ad242b015b37198dafb11ee776 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |