Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JUNE 29, 2018 FBO #6062
SOLICITATION NOTICE

Y -- Designing and Constructing Channel Maintenance - Package #1

Notice Date
6/27/2018
 
Notice Type
Combined Synopsis/Solicitation
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
International Boundary and Water Commission, Acquisition Division, Acquisition Division, 4171 North Mesa, Suite C-100, El Paso, Texas, 79902, United States
 
ZIP Code
79902
 
Solicitation Number
191BWC18R0010
 
Point of Contact
Philip K. Johnson, Phone: 9158324714
 
E-Mail Address
philip.johnson@ibwc.gov
(philip.johnson@ibwc.gov)
 
Small Business Set-Aside
N/A
 
Description
J.09 J.08 J.07 J.06 J.05 J.04 J.03 J.02 J.01 Solicitatation This is a Solicitation for the designing and constructing channel maintenance structures at an arroyo location known as Placitas Arroyo within the Rio Grande Canalization Project (RGCP) in Do ñ a Ana County, New Mexico. This requirement is subject to availability of funds (SAF) The work requires evaluation of alternatives, design, and construction of channel maintenance structures to reduce sediment inflow to the RGCP. Major tasks for the Phase I - Design of the project: <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l2 level6 lfo3; tab-stops: 22.5pt;"> 1. Site investigation <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l2 level6 lfo3; tab-stops: 22.5pt;"> 2. Site surveying <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l2 level6 lfo3; tab-stops: 22.5pt;"> 3. Any required geotechnical investigations, modeling, or testing. <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l2 level6 lfo3; tab-stops: 22.5pt;"> 4. Production of construction documents (drawings and technical specifications) <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l2 level6 lfo3; tab-stops: 22.5pt;"> 5. Production of all project reports <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l2 level6 lfo3; tab-stops: 22.5pt;"> 6. HEC-RAS 2D/FLO-2D/HEC-RAS Modeling <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l2 level6 lfo3; tab-stops: 22.5pt;"> 7. Coordination with stakeholders <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-indent: -27.0pt; mso-list: l2 level6 lfo3; tab-stops: 22.5pt;"> 8. Coordination with USIBWC Major tasks for the Phase II - Construction of the project: <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l3 level1 lfo4; tab-stops:.5in;"> 1. Site preparation <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l3 level1 lfo4; tab-stops:.5in;"> 2. Construction of channel maintenance structures at the arroyo <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l3 level1 lfo4; tab-stops:.5in;"> 3. Build access roads needed for routine maintenance <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l3 level1 lfo4; tab-stops:.5in;"> 4. Disposal of sediment, debris, and construction waste from jobsite <h6 style="margin-top: 2.0pt; margin-right: 0in; margin-bottom:.0001pt; margin-left: 49.5pt; text-align: justify; text-indent: -27.0pt; mso-list: l3 level1 lfo4; tab-stops:.5in;"> 5. Final site surveying The Design‑Builder shall be responsible for complying with all applicable regulations, laws, or permitting authorities pertaining to construction of this project. The magnitude of the project is estimated between $1,000,000 and $5,000,000. The work will be performed under NAICS Code 237990. This is solicited as Full and Open Compitition The contract will be firm-fixed price.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/IBWC/IMD/ElPasoTX/191BWC18R0010/listing.html)
 
Record
SN04970089-W 20180629/180627230710-ad061275264f982481cb28ec057c2b1b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.