Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JULY 12, 2018 FBO #6075
AWARD

Z -- Repair HVAC Piping & Sensors - Award

Notice Date
7/10/2018
 
Notice Type
Award Notice
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
Department of the Army, Army Contracting Command, MICC, MICC - Fort Leavenworth, 535 Kearny Ave, Bldg 338, Fort Leavenworth, Kansas, 66027, United States
 
ZIP Code
66027
 
Solicitation Number
W91QF4-18-C-0003
 
Archive Date
7/25/2018
 
Point of Contact
Alphonso Barnes, Phone: 913-684-1643, Teresa L. Sumner, Phone: 913-684-1635
 
E-Mail Address
alphonso.j.barnes.civ@mail.mil, teresa.l.sumner.civ@mail.mil
(alphonso.j.barnes.civ@mail.mil, teresa.l.sumner.civ@mail.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W91QF4-18-C-0003
 
Award Date
7/10/2018
 
Awardee
American Legacy Construction, 1121 SE Broadway Dr.<br />, Lees Summit, Missouri 640481, United States
 
Award Amount
$24,623.00
 
Description
KO J&A Sole Source Justification -18-C-0003 - ALC - Install Bypass Piping The work consist of furnishing all plant. labor, equipment, and materials to perform all work in strict accordance with this statement of work to a.) Install new 3/4 inch bypass piping and insulation. Install (2) 3/4 inch control valve, one for each loop; b.) Install new (2) differential pressure sensors for bypass system piping. Install DP assembly for fan coil. Convert existing 3-way valves to 2-way valve within fan coils in each room; c.) Associated pipe insulation and; d.) Testing and balance the system in Bldg. 268. All work performed by the contractor shall result in a complete, functional piping and sensors. This requirement is in respondence to a previously repaired HVAC system. Therefore, only one responsible source it is in the best interest of the Government to prevent violating the current warranty on the HVAC system. It also reduce time delays and issues caused by the system not having the bypass. If any other company performs any work associated with this unit, it will void the warrany on the recently installed HVAC unit. The Contracting Officer has determined utilizing other than full and open competition (FAR Subpart 6.302-1: Only one responsible source and no other supplier or service will satisfy agency requirement, Cite: 10 USC 2304(c)(1).
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/notices/9c46b8bff11a726c51dea89a7ee42596)
 
Record
SN04984507-W 20180712/180710230856-9c46b8bff11a726c51dea89a7ee42596 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.