Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JULY 12, 2018 FBO #6075
SOLICITATION NOTICE

Z -- Provide Design/Build services to rehabilitate the existing hybrid photovoltaic

Notice Date
7/10/2018
 
Notice Type
Presolicitation
 
NAICS
237130 — Power and Communication Line and Related Structures Construction
 
Contracting Office
FWS, DIVISION OF CONTRACTING AND GE EASTSIDE FEDERAL COMPLEX 911 NE 11TH AVENUE PORTLAND OR 97232-4181 US
 
ZIP Code
00000
 
Solicitation Number
140F0518R0032
 
Response Due
8/22/2018
 
Archive Date
9/6/2018
 
Point of Contact
Boisvert, Ryan
 
Small Business Set-Aside
Total Small Business
 
Description
This is a Pre-Solicitation/Synopsis: This opportunity is only available to Small Businesses. The U.S. Fish and Wildlife Service Region 8, has a requirement for Design/Build services to rehabilitate the existing hybrid photovoltaic system at Farallon Island National Wildlife Refuge, CA (San Francisco County). This requirement is being procured in accordance with FAR Part 15, Contracting by Negotiation. This will be a Firm Fixed Priced Contract and Award will be based on Lowest-Price Technically-Acceptable (LPTA). The Solicitation and associated documents (specifications, drawings, etc.) will be posted to https://www.fbo.gov and available on https://www.fedconnect.net/FedConnect/Default.htm public opportunities on or about July 23, 2018. Interested contractors must be registered in SAM (System for Award Management, www.sam.gov) and complete Online Representations and Certifications. A pre-proposal site visit is scheduled for Saturday, August 4, 2018 at 0700 hrs. Contractors will be required to provide the Contracting Officer with the names, phone numbers, and emails of all of those attending by close of business on Monday July 30, 2018. Those who do not provide this information by the due date will not be allowed to board the boat. Additional information will be provided when the full solicitation is posted. The work will commence within 15 days of Notice to Proceed and be completed by Friday, March 15, 2019. The NAICS code is 237130 “ Power and Communication Line and Related Structures Construction and the size standard is $36.5 million. The project magnitude is between $100,000 and $250,000. Bonding Requirements: 20% Bid Bond, 100% Payment Bond, 100% Performance Bond Direct questions to Ryan Boisvert, Ryan_Boisvert@fws.gov, (413) 253-8531.
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/DOI/FWS/CGSWO/140F0518R0032/listing.html)
 
Record
SN04986244-W 20180712/180710231619-be5c08d476026b4cdc0537041026c69f (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.