Y -- National Cemetery of the Alleghenies Phase 3 Gravesite Development - Attachment

Notice Date
7/11/2018
 
Notice Type
Attachment
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
Department of Veterans Affairs;Office of Construction and;Facilities Management (003C4B);425 I St, NW;Washington DC 20001
 
ZIP Code
20001
 
Solicitation Number
36C10F18R0651
 
Response Due
8/2/2018
 
Archive Date
11/9/2018
 
Point of Contact
Mary E. Case
 
E-Mail Address
gton,
 
Small Business Set-Aside
Total Small Business
 
Description
Page 2 of 2 NATIONAL CEMETERY OF THE ALLEGHENIES PHASE III GRAVESITE DEVELOPMENT; PROJECT No. 925CM2006 PRE-SOLICITATION STATEMENT OF WORK This procurement is a 100% Total Set-Aside for Small Business. This is first stage of the forthcoming Request for Proposal (RFP) for a construction contract for the expansion of the National Cemetery of the Alleghenies, Bridgeville PA. Project Description: The purpose of this project is to enable an existing national cemetery to continue to provide burial services for eligible veterans in southwestern Pennsylvania. Located in Washington County, just south of Pittsburgh, the National Cemetery of the Alleghenies serves Veterans of the greater Pittsburgh metropolitan area, northwestern West Virginia, and southeastern Ohio. This proposed development will provide an additional 10 years of continued burial service to an estimated Veteran population of approximately 258,300 who has been served by this national cemetery since it opened in August 2005. This project will provide an additional 10-year gravesite inventory for all burial options until FY 2031. In accordance with the master plan for the entire 292-acre site, this project will develop approximately 40 acres of the 202 undeveloped acres remaining at the National Cemetery of the Alleghenies. This project will comprise the third construction phase of cemetery development, and will primarily include the construction of additional burial facilities intended to provide 10 years of service on existing, undeveloped land. The remainder of the site will be developed in future 10-year phased projects. Since this is an existing cemetery, only those facilities and infrastructure elements necessary to support the added maintenance, operations, and burial capacity for approximately 10 years will comprise this phase of construction. This investment will develop approximately 40 acres of undeveloped land to provide approximately 12,300 gravesites, including both casket and cremation sites in new burial sections. Also included in this project will be the cemetery expansion into the southern cemetery parcel bisected by the state-owned Morgan Road. While the expansion into this area will require a nominal new entrance feature, grade separated connector drive, access roads, irrigation, signage and furnishings, no structures are planned for this area within this project. This grade separated connector drive will be used by staff, maintenance personnel, and visitors to safely access the southern burial sections across Morgan Road. Within the developed northern acreage, this project will provide for irrigation improvements, gravesite expansion areas (including access roads and visitor amenities). Since the cemetery is less than 15 years old, only nominal repairs/ improvements/ security enhancements will be performed to existing cemetery buildings. As needed, unsuitable rock/coal will be excavated from burial areas and removed from the cemetery. This project will also include an evaluation of the existing structures and accomplish and retrofit/incorporate Guiding Principles for High Performance and Sustainable Buildings MOU and Renewable Energy Initiatives as required. Additionally, any FCA condition D or F corrections will be incorporated onto this project. The approximate project duration will be 1,274 calendar days from the Notice to Proceed. The estimated magnitude for this project is between $20,000,000 and $50,000,000. At this time, no solicitation exists. - END - ***** End Word Document - 'FBO-DESCRIPTION' *****
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/VA/vacoofmae/vacoofmae/36C10F18R0651/listing.html)
 
Document(s)
Attachment
 
File Name: 36C10F18R0651 36C10F18R0651_4.docx (https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=4473899&FileName=36C10F18R0651-006.docx)
Link: https://www.vendorportal.ecms.va.gov/FBODocumentServer/DocumentServer.aspx?DocumentId=4473899&FileName=36C10F18R0651-006.docx

 
Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
 
Place of Performance
Address: National Cemetery of the Alleghenies;1158 Morgan Rd;Bridgeville, PA
Zip Code: 15017
 
Record
SN04987022-W 20180713/180711231023-2456dc96e4860a52160035c1a7e6423b (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.