AWARD
Z -- Remodel Front Office Bldg. 20325 KAFB
- Notice Date
- 8/6/2018
- Notice Type
- Award Notice
- NAICS
- 238990
— All Other Specialty Trade Contractors
- Contracting Office
- Department of the Army, U.S. Army Corps of Engineers, USACE District, Albuquerque, Attn: CESPA-CT, 4101 Jefferson Plaza NE, Albuquerque, New Mexico, 87109-3435, United States
- ZIP Code
- 87109-3435
- Solicitation Number
- W912PP18Q0098
- Archive Date
- 8/18/2018
- Point of Contact
- Glenda D. Kohlieber, Phone: 5756524135
- E-Mail Address
-
glenda.d.kohlieber@usace.army.mil
(glenda.d.kohlieber@usace.army.mil)
- Small Business Set-Aside
- N/A
- Award Number
- W912PP18P0061
- Award Date
- 8/3/2018
- Awardee
- Unified Contractor Inc, 609 BROADWAY BLVD NE, SUITE 228, ALBUQUERQUE, New Mexico 87102, United States
- Award Amount
- $111548.98
- Line Number
- 0001
- Description
- This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act. The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 20325 Front Office Remodel. 2. SPECIFIC REQUIREMENTS: Construction: a. Users will remove all furniture b. Reuse existing metal transition strips c. Install rubber transitions strips. d. Rm 201 1. Install new carpet and rubber cove base. 2. Install new powered blackout blinds. 3. Patch/Repair/Skim/Paint room. e. Rm 202 1. Install new carpet and rubber cove base. 2. Install new ribbon power to table. 3. Install comm box at new desk. 4. Protect/Repair chair rail 5. Patch/Repair/Skim/Paint room. f. Rm 203 1. Install new carpet and rubber cove base. 2. Install new powered blackout blinds. 3. Patch/Repair/Skim/Paint room. g. Rm 204 1. Install new carpet and rubber cove base. 2. Install new powered blackout blinds. 3. Patch/Repair/Skim/Paint room. h. Rm 205 1. Install new carpet and rubber cove base. 2. Install new powered blackout blinds. 3. Install new ribbon power to table. 4. Patch/Repair/Skim/Paint room. 5. Install new control panel, J-box and necessary conduit, qty. 2. i. Rm 206 1. Install new carpet and rubber cove base. 2. Install new powered blackout blinds. 3. Patch/Repair/Skim/Paint room 3. REQUIRED SUBMITTALS: a. Submittals required for all items listed below: i. Ribbon Power components ii. Carpet iii. Rubber Base iv. Rubber Transition Strips v. Blinds vi. Paint vii. As-Builts viii. Accident Prevention Plan ix. O&M Manuals x. Waste Summary Checklist if applicable xi. Submittal of Exposure Hours
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA47/Awards/W912PP18P0061.html)
- Record
- SN05022944-W 20180808/180806231332-48fe744e63c89b9c00602c762b459c18 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |