Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF AUGUST 08, 2018 FBO #6102
AWARD

Z -- Remodel Front Office Bldg. 20325 KAFB

Notice Date
8/6/2018
 
Notice Type
Award Notice
 
NAICS
238990 — All Other Specialty Trade Contractors
 
Contracting Office
Department of the Army, U.S. Army Corps of Engineers, USACE District, Albuquerque, Attn: CESPA-CT, 4101 Jefferson Plaza NE, Albuquerque, New Mexico, 87109-3435, United States
 
ZIP Code
87109-3435
 
Solicitation Number
W912PP18Q0098
 
Archive Date
8/18/2018
 
Point of Contact
Glenda D. Kohlieber, Phone: 5756524135
 
E-Mail Address
glenda.d.kohlieber@usace.army.mil
(glenda.d.kohlieber@usace.army.mil)
 
Small Business Set-Aside
N/A
 
Award Number
W912PP18P0061
 
Award Date
8/3/2018
 
Awardee
Unified Contractor Inc, 609 BROADWAY BLVD NE, SUITE 228, ALBUQUERQUE, New Mexico 87102, United States
 
Award Amount
$111548.98
 
Line Number
0001
 
Description
This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act. The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 20325 Front Office Remodel. 2. SPECIFIC REQUIREMENTS: Construction: a. Users will remove all furniture b. Reuse existing metal transition strips c. Install rubber transitions strips. d. Rm 201 1. Install new carpet and rubber cove base. 2. Install new powered blackout blinds. 3. Patch/Repair/Skim/Paint room. e. Rm 202 1. Install new carpet and rubber cove base. 2. Install new ribbon power to table. 3. Install comm box at new desk. 4. Protect/Repair chair rail 5. Patch/Repair/Skim/Paint room. f. Rm 203 1. Install new carpet and rubber cove base. 2. Install new powered blackout blinds. 3. Patch/Repair/Skim/Paint room. g. Rm 204 1. Install new carpet and rubber cove base. 2. Install new powered blackout blinds. 3. Patch/Repair/Skim/Paint room. h. Rm 205 1. Install new carpet and rubber cove base. 2. Install new powered blackout blinds. 3. Install new ribbon power to table. 4. Patch/Repair/Skim/Paint room. 5. Install new control panel, J-box and necessary conduit, qty. 2. i. Rm 206 1. Install new carpet and rubber cove base. 2. Install new powered blackout blinds. 3. Patch/Repair/Skim/Paint room 3. REQUIRED SUBMITTALS: a. Submittals required for all items listed below: i. Ribbon Power components ii. Carpet iii. Rubber Base iv. Rubber Transition Strips v. Blinds vi. Paint vii. As-Builts viii. Accident Prevention Plan ix. O&M Manuals x. Waste Summary Checklist if applicable xi. Submittal of Exposure Hours
 
Web Link
FBO.gov Permalink
(https://www.fbo.gov/spg/USA/COE/DACA47/Awards/W912PP18P0061.html)
 
Record
SN05022944-W 20180808/180806231332-48fe744e63c89b9c00602c762b459c18 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.