Z -- Remote Communications Air/Ground, TOWER REPLACEMENT HSV RCAG, Huntsville, AL - Attachment
- Notice Date
- 8/15/2018
- Notice Type
- Attachment
- NAICS
- 237130
— Power and Communication Line and Related Structures Construction
- Contracting Office
- FEDERAL AVIATION ADMINISTRATION, AAQ-722 AC - Mike Monroney Aeronautical Center (Oklahoma City, OK)
- Solicitation Number
- 31191
- Response Due
- 9/19/2018
- Archive Date
- 9/19/2018
- Point of Contact
- Janice Hammonds, janice.hammonds@faa.gov, Phone: 405-954-7705
- E-Mail Address
-
Click here to email Janice Hammonds
(janice.hammonds@faa.gov)
- Small Business Set-Aside
- Total Small Business
- Description
- Total small business set-aside. Proposals are due by 9/19/18 at 5 p.m. CST. Please send all proposals to van.ctr.nicholson@faa.gov. Site visit at noon on August 28th. See contact information for site visit in Section L of the attached SIR. The scope of work is to replace the (2) existing 70 foot guyed antenna towers, with (2) new 70 foot free standing antenna towers, replace the RF heliax cables from the towers to a new fiberglass junction box to be installed on the South exterior wall of the existing equipment shelter, counterpoise around each tower and related work as specified and indicated by the drawings and/or specifications, which are part of this contract. After the contractor installs each of the antenna tower foundations, assembles and erects each tower and installs the heliax cables, the FAA will then install new LMR-400 cables and antennas on the top of each tower, and cables from the junction boxes into the equipment shelter to each of the equipment racks. After the connectors are installed on each cable, the cables are installed to each rack/radio, and all testing has been completed, the FAA will allow the contractor to remove and demolish all of the guyed towers. The FAA may take up to three weeks to complete the electronic installation from the time that the antenna towers are made available to the FAA until the time that the contractor can start demolition. The contractor will remove the steel towers down to the existing foundation and cut flush with same foundation. The guy wires will be removed to 18 below grade. The foundations will not have to be removed. If you're viewing this announcement from a source other than Federal Aviation Administration Contract Opportunities (FAACO), visit https://faaco.faa.gov/index.cfm/announcement/view/31191 to view the original announcement.
- Web Link
-
FBO.gov Permalink
(https://www.fbo.gov/spg/DOT/FAA/MMACTR/31191/listing.html)
- Document(s)
- Attachment
- File Name: Contractor's Release form (pdf) (https://faaco.faa.gov/index.cfm/attachment/download/92410)
- Link: https://faaco.faa.gov/index.cfm/attachment/download/92410
- File Name: HSV RCAG Specs Complete (pdf) (https://faaco.faa.gov/index.cfm/attachment/download/92407)
- Link: https://faaco.faa.gov/index.cfm/attachment/download/92407
- File Name: Wage Determination (pdf) (https://faaco.faa.gov/index.cfm/attachment/download/92408)
- Link: https://faaco.faa.gov/index.cfm/attachment/download/92408
- File Name: SIR (pdf) (https://faaco.faa.gov/index.cfm/attachment/download/92405)
- Link: https://faaco.faa.gov/index.cfm/attachment/download/92405
- File Name: HSV RCAG Complete (drawings) (pdf) (https://faaco.faa.gov/index.cfm/attachment/download/92406)
- Link: https://faaco.faa.gov/index.cfm/attachment/download/92406
- File Name: Experience form (pdf) (https://faaco.faa.gov/index.cfm/attachment/download/92409)
- Link: https://faaco.faa.gov/index.cfm/attachment/download/92409
- Note: If links are broken, refer to Point of Contact above or contact the FBO Help Desk at 877-472-3779.
- File Name: Contractor's Release form (pdf) (https://faaco.faa.gov/index.cfm/attachment/download/92410)
- Record
- SN05039447-W 20180817/180815231638-d9c9c8672c815559c39df8500b2639c8 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |