Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF JANUARY 16, 2019 FBO #6263
SOLICITATION NOTICE

N -- Install of OSP and ISP

Notice Date
1/14/2019
 
Notice Type
Combine Synopsis/Solicitation
 
NAICS
238210 — Electrical Contractors and Other Wiring Installation Contractors
 
Contracting Office
5865 Swaab Blvd Nellis AFB NV 89191-7063
 
ZIP Code
89191-7063
 
Solicitation Number
F3GHBA8340AW01
 
Response Due
1/31/2019
 
Archive Date
2/2/2019
 
Point of Contact
Andrew Grove, Contract Specialist, Phone 7026529578, - Julia A. Pettit, Contract Officer
 
E-Mail Address
andrew.grove.3@us.af.mil, julia.pettit@us.af.mil
 
Small Business Set-Aside
Total Small Business
 
Description
1. SCOPE: Contractor shall furnish all design, labor, equipment, material, transportation, administration, supervision and determine required period of performance necessary to perform all operations in connection with successfully providing Communications Cabling to Building 10571 at Nellis AFB, Las Vegas, Nevada. When complete, the project shall be as shown below (either in the attached sketch or work description). 2. LOCATION: The project site is located at Nellis AFB, Nevada. The Main base is located approximately nine (9)miles north of downtown Las Vegas on Highway US 93 (Las Vegas Blvd.). NAFB consists of three main areas: the Main Base, Area II and Area III. 3. COMMUNICATIONS SPECIFICATIONS: The design and construction of the communications system shall comply with the requirements stated in the following documents: Section 271000 Building Telecommunications Cabling System, latest edition; 38 EIG Handbook 33-01 Communications and Information FIRST FOUR HUNDRED FEET; Engineering Technical Letter (ETL) 02-12: Communications and Information System Criteria for Air Force Facilities; UFC 3-580-01 Telecommunications Building Cabling Systems Planning and Design; Telecommunication Industry Association (TIA) Standards; Comm Room Wiring Plan. All work under this section shall be performed by and all equipment shall be furnished and installed by a Building Industry Consulting Service International (BICSI) certified telecommunications contractor. Any conflicts between standards must be brought to the Contracting Officer's attention and will be resolved through the appropriate 99CS Plans and Programs office. 4. DRAWING STANDARDS: Please provide As-Built drawings, heat maps, equipment lists, with Serial Numbers and spectrum analysis results for all desired coverage areas and acceptance testing documentation/report as show within 30 days of project completion. 5. ENVIRONMENTAL PROTECTION: 5.1 The Contractor Shall Identify walls, ceiling tiles and areas that will be penetrated or disturbed for successful completion of the project. 5.2 The Customer shall submit an AF Form 332 to survey/test for Asbestos Containing Material (ACM) and Lead Base Paint (LBP) in the areas of penetration/disturbance. 5.3 The cost of testing if required will be funded by the customer. 6. WORKING HOURS: Standard working hours are from 7:00 a.m. to 4:00 p.m. Monday through Friday excluding Federal Holidays and the day after Thanksgiving. Contractor requested deviations to this schedule will be considered if it is in the best interest of the government as determined by the Contracting Officer. If the Contractor desires on working hours other than 7:00 am to 4:00 pm, Monday through Friday, he must submit to the Contracting Officer a work schedule at least five working days prior. The schedule shall note the activities planned, the planned hours of work, and the reason for the additional hours so that the construction inspectors can plan their work schedule. DESCRIPTION OF WORK: Bldg. 10571 requires installation of Outside Plant cabling 25 pairs of Copper and 12 Strands Fiber Optic Cable to be spiced in the Manhole Specified by the 99th CS/SCOIC Cable Shop Ph: (702) 652-2423. Additionally, all Cabinets, Building Entrance Terminals, Premise Wiring Cable Supports, Patch Panels, Cabling and Faceplates will need to be installed to provide all infrastructure required to make the facility Operational. Please see attached Drawings provided. All Equipment and cabling installed will comply with Nellis-Creech Comm Stds NC 2710. NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (14-JAN-2019); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT 877-472-3779 or fbo.support@gsa.gov REGARDING THIS ISSUE.
 
Web Link
Link To Document
(https://www.fbo.gov/spg/USAF/ACC/99CONS/F3GHBA8340AW01/listing.html)
 
Place of Performance
Address: Nellis AFB Nellis AFB, NV
Zip Code: 89191
Country: US
 
Record
SN05193970-F 20190116/190114230017 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.