MODIFICATION
Z -- Herbert Hoover Dike Rehabilitation, Structure Replacements S-284 (HP-5) Reconstruction, Glades County, Florida
- Notice Date
- 1/23/2019
- Notice Type
- Modification
- NAICS
- 237990
— Other Heavy and Civil Engineering Construction
- Contracting Office
- P.O. Box 4970 Jacksonville FL 32232-0019
- ZIP Code
- 32232-0019
- Solicitation Number
- W912EP18R0042
- Response Due
- 2/12/2019
- Point of Contact
- Tonya M. Rogers, Contract Specialist, Phone 9042321084, - Claurice M. Dingle, Contract Specialist, Phone 904-232-1387, Fax 904-232-2748
- E-Mail Address
-
tonya.m.rogers@usace.army.mil, claurice.m.dingle@usace.army.mil
- Small Business Set-Aside
- N/A
- Description
- The work includes removing an existing Herbert Hoover Dike Culvert HP-5 and the construction of new water control structure S-284 within the same footprint as the existing structure. The new construction of S-284 will require the installation of a steel sheet pile cofferdam with earthen plugs on the lakeside and an earthen cofferdam on the landside. These features are required to excavate, remove the existing structure, and construct the new S-284. The landside cofferdam will also serve as a bypass road for the Contractor, Government, Seminole Tribe of Florida (STOF), and State personnel and other construction Contractors (construction equipment) not associated with this contract. Dewatering will be required to control the groundwater in accordance with contract specifications. The structure will include cast-in-place reinforced concrete foundations, headwalls, and culvert. A combination flap/slide gate will be installed at the lakeside headwall. S-284 will consist of one (1) 8-foot by 8-foot culvert. In addition to the 8-foot by 8-foot culvert, a 42-inch conduit will be installed through the embankment just south of the S-284 structure for future pumped water supply. The pumps and infrastructure will be installed under a separate contract. Once the embankment is constructed to the lines and grades shown, riprap will be installed as shown, and a control building will be installed on the work platform. Work also includes operation of the by-pass pump system, grassing and turbidity monitoring. After completion of S-284 construction, the steel sheet pile and earthen cofferdams will be removed. The period of performance for this procurement is a total of 869 calendar days plus 90 calendars to establish grass and sodding from issuance of the Notice to Proceed. NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (23-JAN-2019); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT 877-472-3779 or fbo.support@gsa.gov REGARDING THIS ISSUE.
- Web Link
-
Link To Document
(https://www.fbo.gov/spg/USA/COE/DACA17/W912EP18R0042/listing.html)
- Place of Performance
- Address: Glades County, FL
- Country: US
- Country: US
- Record
- SN05201291-F 20190125/190123230044 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |