SPECIAL NOTICE

Y -- Corpus Christi Ship Channel Imrovement Project Contract 2, Lower Bay Reach in Nueces County, Texas.

Notice Date
2/8/2019
 
Notice Type
Synopsis
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
2000 Fort Point Road PO Box 1229 Galveston TX 77553-1229
 
ZIP Code
77553-1229
 
Solicitation Number
W912HY19RFI3738
 
Response Due
2/15/2019
 
Point of Contact
Lucille R. Smith, Contract Specialist, Phone 4097663845, - Curtis Nmi Cole, Contracting Officer, Phone (409) 766-3185, Fax (409) 766-3010
 
E-Mail Address
lucille.r.smith@usace.army.mil, curtis.cole@usace.army.mil
 
Small Business Set-Aside
N/A
 
Description
THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS SYNOPSIS. The U.S. Army Corps of Engineers (Corps), Galveston District, is requesting input from government, industry, and others parties for an upcoming dredging project. The Corpus Christi Ship Channel, Texas Channel Improvement Project Contract 2 - Lower Bay Reach is a project that proposes the deepening and widen the existing channel, rehabilitation of an existing placement area (PA 6) and creation of two new partial confined beneficial use placement areas (BU I and BU CQ). Dredging from station 7+000, just bay side of the Port Aransas Ferry Landing to station 70+000, some 11.9 miles through Redfish Bay, past the La Quinta Junction and partially into Corpus Christi Bay. The contract involves the complete clean out (maintenance material) of the existing channel 47 feet Mean Lower Low Water (MLLW)) template and the construction (new work) of the new channel 54 feet MLLW template. The maintenance material from the existing project template is estimated to generate 1,108,254 cubic yards (CYDs). The construction of the new deepening and widening of the channel (authorized depth and advanced maintenance) is estimated to generate 8,751,508 CYDs, with allowable over depth estimated at 2,002,982 CYDs. The construction of the PA 6 will involve raising berms and constructing shoreline stabilization. The beneficial use areas involve berm construction with hydraulic fill which would be allowed time to consolidate and then armored. The estimated completion time for this contract is 810 calendar days. The dredging plant type is not being specified for this Request for Information. NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (08-FEB-2019); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT 877-472-3779 or fbo.support@gsa.gov REGARDING THIS ISSUE.
 
Web Link
Link To Document
(https://www.fbo.gov/spg/USA/COE/DACA64/W912HY19RFI3738/listing.html)
 
Place of Performance
Address: 2000 Fort Point Road Galveston, TX
Zip Code: 77553
Country: US
 
Record
SN05216888-F 20190210/190208230017 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.