SOURCES SOUGHT
P -- Eastside Bypass Improvements Project Weir Removal
- Notice Date
- 2/15/2019
- Notice Type
- Synopsis
- NAICS
- 238910
— Site Preparation Contractors
- Contracting Office
- Bureau of Reclamation<br />Mid-Pacific Region<br />Regional Office<br />Division of Acquisition Services<br />2800 Cottage Way, Room E-1815<br />Sacramento<br />CA<br />95825-1898<br />US<br />
- ZIP Code
- 95825
- Solicitation Number
- 140R2019B0005
- Response Due
- 2/25/2019
- Archive Date
- 3/12/2019
- Point of Contact
- Yousefgoarji, Rosana
- Small Business Set-Aside
- N/A
- Description
- This announcement is to all Small Business, 8(a) Small Business, HUBZone Small Business, Service-Disabled Veteran-Owned Small Business and Women-Owned Small Business concerns that may be interested in performing a contract for the Mid-Pacific Region of the Bureau of Reclamation. The work to be performed is described below. Based upon response to this announcement, the Government may determine to set this acquisition aside or proceed with an unrestricted solicitation. The applicable North American Industry Classification System (NAICS) Code is 238910 and the related small business size standard is $14.0M. This notice is not a request for proposal and the information presented in this announcement will not obligate the Bureau of Reclamation in any manner. The estimated cost of this project is between $300,000.00 and $500,000.00. This procurement will require 100% performance and payment bonds. The work is located within the Eastside Bypass Flood Control Channel, approximately 16 miles south-west of Merced, California in Merced County. Interested parties should include the following information in their response: (a) Business name, address, cage code, size classification based on NAICS size standard, socioeconomic classification (i.e. HUBZone; 8(a), etc.), and a point of contact; (b) A positive statement of your intention to submit an offer for this solicitation as a prime contractor; (c) Evidence of your experience performing work similar in type and scope to the work in this announcement within the last five years. The evidence should include: contract numbers, project titles, dollar amounts and points of contacts with telephone numbers. Please do not include more than three past projects; and (d) Include attachments cataloging the company's equipment assets, personnel resources and financial resources that demonstrate company responsibility and capability to perform required work. (e) If bonding is required, also provide evidence of your bonding capacity; All interested parties are encouraged to respond to this notice, by e-mail to ryousefgoarji@usbr.gov not later than 02/25/2019 at 10:00am. The information provided in this announcement is all information the Government has available at this time. There are no specifications, drawings, bid packages, or source lists available. System for Award Management (SAM) applies to this procurement. Prospective contractors must be registered in the System for Award Management (SAM) prior to award. Lack of registration in the SAM database will make an offeror ineligible for award. Information on SAM registration can be obtained via the Internet at http://www.sam.gov PRINCIPAL COMPONENTS OF WORK: A. Remove, crate, and deliver gaging station hardware to US Bureau of Reclamation, Friant Dam Office, Friant CA. B. Construct Coffer Dams as required to protect sites during the work. C. Selectively saw-cut and remove reinforced concrete pier walls, sill walls, structural and miscellaneous metalwork, timber planking, and miscellaneous hardware. Existing concrete buried cut-off walls and slab to remain as a permanent feature at the Lower Weir. All features shall be removed at the Upper Weir. D. Excavate and remove existing reinforced concrete abutments (4 total, 2 each at the Upper and Lower weirs). E. Place soil backfill in excavated areas at each abutment site. F. Do not compact soil, which would inhibit re-vegetation efforts. G. Recycle, reuse, salvage, or dispose of all waste materials removed at permitted sites. H. Restore disturbed soil areas, primarily at the abutments but potentially other locations around the weirs. I. Install erosion control measures as required by permits to prevent loss of soil materials. J. Place seeding mix, saplings, and other items (fertilizer, irrigation, etc.) to initiate re-vegetation efforts. K. Restore other disturbed areas. NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (15-FEB-2019); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT 877-472-3779 or fbo.support@gsa.gov REGARDING THIS ISSUE.
- Web Link
-
Link To Document
(https://www.fbo.gov/notices/a2e272e59ba958e75167f8b03b36c451)
- Record
- SN05224018-F 20190217/190215230012 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |