MODIFICATION

N -- REPLACEMENT OF HVAC SYSTEM IN BLDG #1

Notice Date
3/13/2019
 
Notice Type
Modification
 
NAICS
238220 — Plumbing, Heating, and Air-Conditioning Contractors
 
Contracting Office
BIA SPRO 00003<br />100 NORTH RIVERSIDE DRIVE<br />Contracting Office<br />Anadarko<br />OK<br />73005-0368<br />US<br />
 
ZIP Code
73005
 
Solicitation Number
140A0319B0002
 
Response Due
3/22/2019
 
Archive Date
4/6/2019
 
Point of Contact
Littlechief, Jocelyn
 
Small Business Set-Aside
Total Small Business
 
Description
REPLACEMENT OF HVAC SYSTEM BUILDING #1 PUSHMATAHA HALL THIS AMENDMENT IS TO CLARIFY AND ANSWERS QUESTIONS FROM SITE VISITS. ADD ON: 1. The existing vent in the conference room needs to be better secured and supported better within the grid and one additional vent in that room needs to be added which will also need to include insulated ducting (flexible or rigid). 2. In the basement there is a supply duct that need to be insulated 15 ft of it with fiberglass insulation to prevent sweating in the AC mode it is approximately a 2-21/2 ft diameter. THE FOLLOWING QUESTIONS WERE ASKED DURING WALK THROUGHS. SEE QUESTION AND RESPONSE. 1. Can the wiring between the unit and disconnect be reused? Answer: No, it should be new along with the 3 wire whips, as stated in SOW. 2. Can the existing transition piece be reused? Answer: As long as it is insulated inside or aluminum clad outside for the insulating factor and is a clean fit to the new unit, Yes. I do not want it chopped and patched and made to fit if the new unit is different on supply and return. 3. The existing 6ft of gas line is currently 1/2" and we would like it to be modified to 3/4". 4. The question was ask can the penetration of the whips and or gas line remain? Answer: they need to be proper and neat where they enter/penetrate the building and made sure not to leak interior of the building to interior. This should be a given within the SOW. 5. The current unit is two stage and we want it replaced with the same, meaning two compressors and no less than 10 ton. 6. Test and Balance can it be done internally or does it have to be done 3rd party? Answer: This should be done by an independent contractor. 7. Can a manual volume damper be used in place of economizer? Answer No NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (13-MAR-2019); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT 877-472-3779 or fbo.support@gsa.gov REGARDING THIS ISSUE.
 
Web Link
Link To Document
(https://www.fbo.gov/spg/DOI/BIA/RestonVA/140A0319B0002/listing.html)
 
Place of Performance
Zip Code: 66046
 
Record
SN05249100-F 20190315/190313230120 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  © 1994-2020, Loren Data Corp.