Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MARCH 30, 2019 FBO #6336
SOLICITATION NOTICE

Y -- Construction of P-117, Vicenza High School Replacement, Vicenza Italy

Notice Date
3/28/2019
 
Notice Type
Synopsis
 
NAICS
236220 — Commercial and Institutional Building Construction
 
Contracting Office
N62470 NAVFAC Atlantic Code AQ 6506 Hampton Blvd, Building A Norfolk, VA
 
ZIP Code
23508
 
Solicitation Number
N6247019R5007
 
Point of Contact
Anna Sarah Bellinger 757-322-4920 Anna Sarah Bellinger, 757-322-4920, anna.bellinger@navy.mil
 
Small Business Set-Aside
N/A
 
Description
THIS IS NEITHER A REQUEST FOR QUOTE OR PROPOSAL NOR AN INVITATION FOR BID. THE INTENT OF THIS PRE-SOLICITATION SYNOPSIS IS TO INFORM POTENTIAL OFFERORS OF THIS REQUIREMENT. SOLICITATION DOCUMENTS WILL NOT BE AVAILABLE FOR DOWNLOADING UNTIL APPROXIMATELY 18 APRIL 2019. Naval Facilities Engineering Command Atlantic (NAVFAC LANT) intends to issue a request for proposal for a Design Bid Build, Firm Fixed Price contract for construction of P 117, Vicenza High School Replacement, Vicenza Italy. This will be a full and open competitive procurement. The scope of work consists of the following: P-117 Vicenza High School Replacement will construct a multi-story high school with functional areas containing neighborhoods, learning studios, learning hubs, staff collaboration areas, career technical education areas, computing center, science labs, art room, music suites, junior reserve officer training corps firing range/classrooms, occupational therapy/physical therapy, learning impaired mild moderate severe, a commons area, performance space, information center, a physical education area with gymnasium, food service, administrative offices, guidance counseling center, a special education office, health services area, maintenance support, central storage area, technology service center, and other required areas for a fully functioning high school. Typical construction is anticipated to consist of shallow spread footings, reinforced concrete structural frame and plastered reinforced concrete exterior walls, interior concrete, masonry and drywall partitions, and operable/movable partition walls. In addition to the multi-story high school, the project will construct a single story field house with functional areas containing concession, concession storage, restrooms, team equipment storage, and a covered gathering area. Typical construction is anticipated to consist of concrete beam and pile foundation, concrete and structural steel frame, concrete exterior walls, gypsum wallboard partitions, and reinforced concrete walls. The project includes related infrastructure such as heating, ventilation and cooling central plant equipment expansion, water, sewer, electrical, gas, telecommunications and storm water utilities, reconfiguration of bus parking areas to increase available parking, mechanical rooms, emergency access lanes and delivery areas. The project includes site improvements including athletic fields, athletic courts, service drive, signage, fencing, paving, landscaping, exterior lighting, utilities, and electrical equipment enclosure, as well as outdoor learning areas. NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (28-MAR-2019); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT 877-472-3779 or fbo.support@gsa.gov REGARDING THIS ISSUE.
 
Web Link
Link To Document
(https://www.fbo.gov/spg/DON/NAVFAC/N62470CON/N6247019R5007/listing.html)
 
Record
SN05263325-F 20190330/190328230015 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.