Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF MARCH 31, 2019 FBO #6337
SOURCES SOUGHT

56 -- Request for Information (RFI) and Participation for Material Source Inquiry Rehabilitate Many Glacier Road

Notice Date
3/29/2019
 
Notice Type
Synopsis
 
NAICS
212321 — Construction Sand and Gravel Mining
 
Contracting Office
610 East Fifth Street Vancouver WA 98661-3801
 
ZIP Code
98661-3801
 
Solicitation Number
69056719SS000009
 
Response Due
4/19/2019
 
Point of Contact
Contracts G. Office, Western Federal Lands Highway Division, Phone (360)619-7520, Fax (360)619-7932
 
E-Mail Address
WFL.Contracts@dot.gov
 
Small Business Set-Aside
N/A
 
Description
The Western Federal Lands Highway Division (WFLHD) of the Federal Highway Administration (FHWA), in cooperation with the National Park Service (NPS) - Glacier National Park (GNP) and the Blackfeet Nation, is proposing to rehabilitate the Many Glacier Road from just west of Babb Montana to the Many Glacier Hotel Loop Road intersection, in Glacier County Montana. As part of our due diligence, we are reaching out to area material source owners to assess what source and types of material may be available, whether available material is weed-free certified and meeting requirements of the NPS and the Blackfeet Nation, and if not, whether the gravel pit owner would be willing to have further dialogue about the project in regards to undertaking an advanced weed-free treatment program for eventual consideration of use by future construction bidders. Background of Project The project will rehabilitate the 12.4 mile-long Many Glacier Road. The first 4.8 miles of the road lie within the Blackfeet Indian Reservation, where it joins Highway 89 at Babb, Montana. The remaining 7.6 miles of the road are within Glacier National Park. We have broken this project into two distinct segments. Segment 1 is identified as the portion of Many Glacier Road within the park [MT NPS 14(4)] and Segment 2 is the portion of Many Glacier Road outside the park [MT Glacier 14(1)]. Both segments will be combined and advertised as one reconstruction contract. Construction is tentatively proposed for Fiscal Year 2020 and is expected to last two or three construction seasons. In general, the proposed project will closely follow the existing horizontal and vertical alignments of Many Glacier Road and reconstruction will provide a roadway with a consistent 22 foot-wide paved surface. This includes providing improved base material beneath the roadway, installing new asphalt concrete pavement surfacing, and replacing failed, undersized, or otherwise deficient culverts. NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (29-MAR-2019); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT 877-472-3779 or fbo.support@gsa.gov REGARDING THIS ISSUE.
 
Web Link
Link To Document
(https://www.fbo.gov/spg/DOT/FHWA/WFL/69056719SS000009/listing.html)
 
Place of Performance
Address: Glacier National Park, MT
Country: US
 
Record
SN05264919-F 20190331/190329230017 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.