MODIFICATION
Y -- Big Four Boardwalk
- Notice Date
- 4/5/2019
- Notice Type
- Modification
- NAICS
- 237310
— Highway, Street, and Bridge Construction
- Contracting Office
- 2930 Wetmore Avenue Ste 3A Everett WA 98201
- ZIP Code
- 98201
- Solicitation Number
- 1205M619R0001
- Point of Contact
- Brian A. Johnson, Contract Specialist/Contracting Officer, Phone 4257836056
- E-Mail Address
-
bajohnson03@fs.fed.us
- Small Business Set-Aside
- Total Small Business
- Description
- SOLICITATION ISSUANCE STATUS : This special notice serves the purpose of the required 15-day presolicittion notice as required by the Federal Acquisition Regulation. The FBO Notice is modifided as detailed below. PROJECT DESCRIPTION : The Forest Service is seeking proposals for the design and construction of a boardwalk substructure and superstructure that includes two 20 ft. long bridges. The boardwalk and bridges shall have a total width of 8 ft. The extent of how much boardwalk will be constructed depends on the final price proposals and available funds. Refer to the schedule of items and drawings for the base work items and optional work items. Work will also include removal and disposal of the existing boardwalk (two layers of boardwalk in some locations), concrete sidewalk, and bridges. Work will be conducted over a wetland landscape so work limits will be confined to the immediate vicinity of the boardwalk and any tracked/wheeled equipment utilized will have to operate from the new or existing boardwalk or other temporary structures as approved. PROJECT LOCATION : Darrington Ranger District, Snohomish County, Mt. Baker-Snoqualmie National Forest, Washington State. PROJECT TIMELINES (ESTIMATED) : Contract Award: July 1, 2019. Construction Season: August 1-September 30 (annually). Note: Due to the short work window, the USDA Forest Service anticipates that if the work cannot be completed in 2019 it will re-commence in 2020. The period of performance on the contract will cover both years. This is provided to be transparent and to provide clear notice to the prime construction contractor and designer-of-record. RECOMMENDED DAYS FOR CONSTRUCTION : Completion NLT September 30, 2020 (See "Project Timelines" note above). DIRECTIONS TO PROJECT SITE : The project is located at the Big Four Trail Head on the Mt. Baker-Snoqualmie National Forest on the Darrington Ranger District (Latitude: 48°4'4"; Longitude: -121° 30'51") (T30N, R9E, Sec 22, SW ¼, SW ¼). From I-5 at Marysville, WA take exit 200 and go East on 88th Street NE for 2 miles; continue on Ingraham Blvd for 1.1 miles; continue on 84th St NE/Getchell Rd for 5.2 miles; turn left onto WA-92 East for 1.2 miles; at traffic circle take exit onto WA-92 West/Quarry Road for 2 miles; Turn left onto Mountain Loop Highway and proceed 24.6 miles to Big Four Trail Head and project site. CONTRACT TYPE SELECTION : The solicitation and resultant contract will be a firm-fixed-price (FFP) Two Phase Design Build project. DISCLOSURE OF TARGET BUDGET : The target budget for this contract will be disclosed when the solicitation is issued. SITE VISIT MEETING NOTES : The site visit meeting notes, i.e. questions, answers, POCs, are attached to this Presolicitation Notice. PROJECT DRAWINGS (DRAFT) : See attached. TECHNICAL POINT OF CONTACT : Luke Silvis, lesilvis@fs.fed.us, (360) 854-2624 NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (05-APR-2019); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT 877-472-3779 or fbo.support@gsa.gov REGARDING THIS ISSUE.
- Web Link
-
Link To Document
(https://www.fbo.gov/spg/USDA/FS/05M6/1205M619R0001/listing.html)
- Place of Performance
- Address: USDA Forest Service Mt. Baker-Snoqualmie National Forest 2930 Wetmore Ave., Ste 3A Everett, WA
- Zip Code: 98201
- Country: US
- Zip Code: 98201
- Record
- SN05273413-F 20190407/190405230055 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |