Loren Data's SAM Daily™

fbodaily.com
Home Today's SAM Search Archives Numbered Notes CBD Archives Subscribe
FBO DAILY - FEDBIZOPPS ISSUE OF APRIL 13, 2019 FBO #6350
SOLICITATION NOTICE

Z -- Herbert Hoover Dike Rehabilitation, Structure Replacements S-284 (HP-5) Reconstruction, Glades County, Florida

Notice Date
10/17/2018
 
Notice Type
Synopsis
 
NAICS
237990 — Other Heavy and Civil Engineering Construction
 
Contracting Office
P.O. Box 4970 Jacksonville FL 32232-0019
 
ZIP Code
32232-0019
 
Solicitation Number
W912EP18R0042
 
Response Due
12/5/2018
 
Point of Contact
Tonya M. Rogers, Contract Specialist, Phone 9042321084, - Claurice M. Dingle, Contract Specialist, Phone 904-232-1387, Fax 904-232-2748
 
E-Mail Address
tonya.m.rogers@usace.army.mil, claurice.m.dingle@usace.army.mil
 
Small Business Set-Aside
N/A
 
Description
The work includes removing an existing Herbert Hoover Dike Culvert HP-5 and the construction of new water control structure S-284 within the same footprint as the existing structure. The new construction of S-284 will require the installation of a steel sheet pile cofferdam with earthen plugs on the lakeside and an earthen cofferdam on the landside. These features are required to excavate, remove the existing structure, and construct the new S-284. The landside cofferdam will also serve as a bypass road for the Contractor, Government, Seminole Tribe of Florida (STOF), and State personnel and other construction Contractors (construction equipment) not associated with this contract. Dewatering will be required to control the groundwater in accordance with contract specifications. The structure will include cast-in-place reinforced concrete foundations, headwalls, and culvert. A combination flap/slide gate will be installed at the lakeside headwall. S-284 will consist of one (1) 8-foot by 8-foot culvert. In addition to the 8-foot by 8-foot culvert, a 42-inch conduit will be installed through the embankment just south of the S-284 structure for future pumped water supply. The pumps and infrastructure will be installed under a separate contract. Once the embankment is constructed to the lines and grades shown, riprap will be installed as shown, and a control building will be installed on the work platform. Work also includes operation of the by-pass pump system, grassing and turbidity monitoring. After completion of S-284 construction, the steel sheet pile and earthen cofferdams will be removed. The period of performance for this procurement is a total of 869 calendar days plus 90 calendars to establish grass and sodding from issuance of the Notice to Proceed. NOTE: THIS NOTICE MAY HAVE POSTED ON FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (17-OCT-2018). IT ACTUALLY APPEARED OR REAPPEARED ON THE FEDBIZOPPS SYSTEM ON 11-APR-2019, BUT REAPPEARED IN THE FTP FEED FOR THIS POSTING DATE. PLEASE CONTACT 877-472-3779 or fbo.support@gsa.gov REGARDING THIS ISSUE.
 
Web Link
Link To Document
(https://www.fbo.gov/spg/USA/COE/DACA17/W912EP18R0042/listing.html)
 
Place of Performance
Address: Glades County, FL
Country: US
 
Record
SN05278483-F 20190413/190411230023 (fbodaily.com)
 
Source
FedBizOpps Link to This Notice
(may not be valid after Archive Date)

FSG Index  |  This Issue's Index  |  Today's FBO Daily Index Page |
ECGrid: EDI VAN Interconnect ECGridOS: EDI Web Services Interconnect API Government Data Publications CBDDisk Subscribers
 Privacy Policy  Jenny in Wanderland!  © 1994-2024, Loren Data Corp.