MODIFICATION
D -- AMEND - SUBMIT QUOTE TO PROVIDE, INSTALL AND MAINTAIN A NEW ACCESS 100MB FAST ETHERNET CIRCUIT BETWEEN BLDG 2201; RM 5440; FL 1; 2201 C ST. NW; WASH, DC, 20520; BLDG PENTAGON; RM BC771; 6607 ARMY DR.; PENTAGON, DC, 20301.
- Notice Date
- 4/11/2019
- Notice Type
- Modification
- NAICS
- 517311
— Wired Telecommunications Carriers
- Contracting Office
- Procurement Directorate - DITCO-Scott
- ZIP Code
- 62225
- Solicitation Number
- HC101318QA389
- Response Due
- 4/30/2019
- Archive Date
- 5/20/2020
- Point of Contact
- Edward Midkiff,618-418-6481;Angelina Hutson,618-418-6496
- Small Business Set-Aside
- N/A
- Description
- AMEND 0004 IS ISSUED TO REVISE SOLICITATION TO CHANGE THE TYPE OF SERVICE TO 100 MB FAST ETHERNET, UPDATE THE INTERFACE TO ETHERNET, AND UPDATE THE CIRCUIT SPECIFICATIONS AND TESTING REQUIREMENTS. EXPEDITE COSTS HAVE BEEN AUTHORIZED TO ENSURE THAT REQUESTED SERVICE DATE OF 03 JUN IS MET. AUTHORIZED COST WILL NOT BE PAID IF REQUESTED SERVICE DATE IS NOT MET. CONTRACTORS MUST INCLUDE EXPEDITE COSTS AS A SEPARATE COST IN QUOTE. *****SEE CHANGES BELOW****** 1.SUBMIT QUOTE TO PROVIDE, INSTALL AND MAINTAIN A NEW ACCESS 100MB FAST ETHERNET CIRCUIT BETWEEN (BLDG) 2201; (RM) 5440; (FL) 1; 2201 C STREET NW; WASHINGTON, DC, 20520/ CCI (BLDG) PENTAGON; (RM) BC771; (FL) N/A; 6607 ARMY DRIVE; PENTAGON, DC, 20301/ CCI. 2. CONTRACTORS ARE RESPONSIBLE FOR READING AND ADDRESSING ALL TECHNICAL REQUIREMENTS OF THIS SOLICITATION, READING AND AGREEING WITH THE STANDARD PROVISIONS, PROVIDE PRICE QUOTATION IN ACCORDANCE WITH STANDARD PROVISION 4, AND MEET THE REQUESTED SERVICE DATE. 3. THE EXPEDITED SERVICE DATE TO BE MET IS: 03 JUN 19 (SIP). CONTRACTORS PROPOSED LEAD TIMES (WHETHER IN CALENDAR OR BUSINESS DAYS) THAT EXCEEDS THE REQUESTED SERVICE DATE WILL NOT BE ACCEPTED AS THIS A CRITICAL REQUIREMENT AN NEEDS AN EXPEDITED INSTALLED. THE GOVERNMENT ASSUMES THAT CONTRACTORS HAVE CONSIDERED ALL ISSUES THAT MAY DELAY THE DELIVERY OF SERVICE ON REQUESTED SERVICE DATE AND MAY CANCEL, TERMINATE, OR REQUEST CONSIDERATION IAW STANDARD PROVISION 42 FOR FAILURE TO MEET CONTRACTUAL SERVICE DATE OR COMPLY WITH ANY CONTRACT TERMS OR CONDITIONS. 4. CONTRACTORS MUST ENSURE THAT QUOTES SHALL INCLUDE SUFFICIENT DETAIL FOR EFFECTIVE EVALUATION AND SHOULD NOT SIMPLY REPHRASE OR RESTATE THE GOVERNMENT REQUIREMENTS. RATHER, CONTRACTORS MUST PROVIDE CONVINCING RATIONALE TO ADDRESS HOW THEY INTEND TO MEET THE REQUIREMENT. BLOCK DIAGRAMS ARE AN ACCEPTABLE WAY TO PROVIDE THE TECHNICAL SOLUTION. 5. QUOTES MUST BE UPLOADED TO IDEAS. 6. CIRCUIT SPECIFICATIONS: CONUS NO JUMBO FRAME ETHERNET VENDOR WILL PERFORM ACCEPTANCE TESTING IN ACCORDANCE WITH EITHER RFC-6815 OR ITU-T Y.1564. VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS IAW ITU-T.Y.1564 SPECIFICALLY, FRAME SIZES OF 64,128,256,512,1024,1280 AND 1518 BYTES MUST BE USED. THE TEST MUST VERIFY LENGTH OF RECEIVED FRAMES, INDICATE NUMBER OF FRAMES DROPPED, NUMBER OF FRAMES RECEIVED OUT OF ORDER, AND DUPLICATE FRAMES. TESTS MUST BE BI-DIRECTIONAL USING THE SAME DATA RATE IN EACH DIRECTION. BURST TESTS MUST BE RUN TO DETERMINE MINIMUM INTERVAL BETWEEN FRAMES THAT CAN BE PROCESSED WITHOUT FRAME LOSS. A THROUGHPUT TEST IS REQUIRED INDICATING THE FASTEST RATE AT WHICH TEST FRAMES CAN BE TRANSMITTED WITHOUT FRAME LOSS. A SEPARATE THROUGHPUT TEST MUST BE RUN WITH FRAMES ADDRESSED TO THE HARDWARE BROADCAST ADDRESS CONSTITUTING AT LEAST 1% OF THE TEST STREAM AND BE EVENLY DISTRIBUTED THROUGHOUT THE TEST. A LATENCY TEST MUST BE RUN FOR A PERIOD OF NO LESS THAN 120 SECONDS, AND REPEATED NO LESS THAT 20 TIMES. THE TEST STREAM FOR THE LATENCY TEST SHOULD BE RUN AT THE THROUGHPUT RATE FOR CORRESPONDING FRAME SIZES FROM THE THROUGHPUT TEST. END TO END LATENCY WILL BE CALCULATED AS THE AVERAGE OVER THE 20 TEST RUNS. FRAME LOSS RATE TESTS SHOULD BE RUN AT THE FRAME RATE CORRESPONDING TO THE MAXIMUM FRAME RATE, AND REDUCED BY 10% INTERVALS UNTIL THERE ARE AT LEAST TWO CONSECUTIVE RUNS IN WHICH NO FRAMES ARE LOST. THROUGHPUT TEST RESULTS: PASSING RATE 100% FOR ALL FRAME BYTE SIZES EXERCISED. FRAME LOSS RATE (%) RESULTS: FRAME LOSS RATE LESS THAN 0.01% FOR ALL FRAME BYTE SIZES EXERCISED. LATENCY WILL BE MEASURED WILL BE ACCORDING TO THE FOLLOWING MAXIMUM TRANSMISSION DELAY FOR ANY CIRCUIT UP TO 500 MILES AIR-MILES IN LENGTH SHALL BE NO GREATER THAN 13MS ONE-WAY AND ANY POINT-TO-POINT CIRCUIT LONGER THAN 500 AIR-MILES SHALL BE NO GREATER THAN 50MS ONE WAY WITHIN THE 48 CONTINENTAL STATES. ANY APS SWITCHOVER SHALL TAKE LESS THAN 50 MILLISECONDS MONTHLY AVAILABILITY SHALL BE NO LESS THAN 99.5%. NOTE: THIS NOTICE WAS NOT POSTED TO FEDBIZOPPS ON THE DATE INDICATED IN THE NOTICE ITSELF (11-APR-2019); HOWEVER, IT DID APPEAR IN THE FEDBIZOPPS FTP FEED ON THIS DATE. PLEASE CONTACT 877-472-3779 or fbo.support@gsa.gov REGARDING THIS ISSUE.
- Web Link
-
Link To Document
(https://www.fbo.gov/spg/DISA/D4AD/DITCO/HC101318QA389/listing.html)
- Record
- SN05279333-F 20190413/190411230109 (fbodaily.com)
- Source
-
FedBizOpps Link to This Notice
(may not be valid after Archive Date)
| FSG Index | This Issue's Index | Today's FBO Daily Index Page |